A robust multiobjective model for the integrated berth and quay crane scheduling problem at seaside container terminals

被引:0
|
作者
Abtin Nourmohammadzadeh
Stefan Voß
机构
[1] University of Hamburg,Institute of Information Systems
关键词
Berth and quay crane scheduling; Maritime container terminal; Robust optimisation;
D O I
暂无
中图分类号
学科分类号
摘要
The ever increasing demand for container transportation has led to the congestion of maritime container terminals in the world. In this work, the two interrelated problems of berth and quay crane scheduling are considered in an integrated multiobjective mathematical model. A special character of this model is that the arrival times of vessels and the failure (working) times of quay cranes are not deterministic and can vary based on some scenarios. Hence, a robust model is devised for the problem having three objectives of minimising the deviations from target berthing locations and times as well as departure delays of all vessels. This robust optimisation seeks to minimise the value of the objectives regarding all the scenarios. An exact solution approach based on the 𝜖-constraint method by the Gurobi software is applied. Moreover, regarding the complexity of the problem, two Simulated Annealing (SA) based metaheuristics, namely a Multi-Objective Simulated Annealing (MOSA) and a Pareto Simulated Annealing (PSA) approach are adapted with a novel solution encoding scheme. The three methods are compared based on some multiobjective metrics and a statistical test. The advantage of the integration of berth and quay crane scheduling is examined as well.
引用
收藏
页码:831 / 853
页数:22
相关论文
共 50 条
  • [41] Scheduling of Quay Crane at Container Terminals based on Ant Colony Algorithm
    Xiao Jianmei
    Wang Xihuai
    Ouyang Lingping
    2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 586 - 592
  • [42] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 168
  • [43] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197
  • [44] Optimal Quay Crane Assignment and Scheduling in Port's Container Terminals
    Al-Refaie, Abbas
    Abedalqader, Hala
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2021, 15 (02): : 153 - 167
  • [45] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    Transportation Research Part E: Logistics and Transportation Review, 2022, 168
  • [46] Simulation-based Optimization on Quay Crane Scheduling of Container Terminals
    Li Haoyuan
    Sun Qi
    2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 1135 - 1139
  • [47] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Omar Abou Kasm
    Ali Diabat
    T. C. E. Cheng
    Annals of Operations Research, 2020, 291 : 435 - 461
  • [48] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)
  • [49] Optimization of continuous berth and quay crane allocation problem in seaport container terminal
    Transportation Management College, Dalian Maritime University, Dalian, China
    Int. Conf. Intelligent Comput. Technol. Autom., ICICTA, 1600, (229-233):
  • [50] Optimization of continuous berth and quay crane allocation problem in seaport container terminal
    Li Na
    Jin Zhihong
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL III, PROCEEDINGS, 2009, : 229 - 233