The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study

被引:0
|
作者
Omar Abou Kasm
Ali Diabat
T. C. E. Cheng
机构
[1] New York University,Department of Civil and Urban Engineering, Tandon School of Engineering
[2] New York University Abu Dhabi,Division of Engineering
[3] The Hong Kong Polytechnic University,Department of Logistics and Maritime Studies
来源
关键词
Berth allocation problem; Quay crane scheduling; Quay crane assignment; Maritime logistics; Seaport operations; Optimization modeling;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers the integration of three essential seaport terminal operations: the berth allocation problem, the quay crane assignment problem (QCAP), and the quay crane scheduling problem (QCSP). The paper presents a new mathematical formulation that captures all associated operations and constraints. Different quay crane operational policies are considered, namely permitting versus not permitting bay task preemption in QCSP and static versus dynamic crane allocations in QCAP. Thus, variants of the mathematical formulation are introduced to capture the different combinations of these scenarios. Due to the preemption consideration, the models include disaggregated quay crane (QC) tasks. Specifically, QC tasks are identified by single container movements as opposed to bay or stack task allocations that are commonly used in the literature. A case study based on Abu Dhabi’s container terminal is presented where the use of the proposed mathematical models are compared against the current existing operational approach. Results show that the service times can be significantly decreased by the use of the proposed models. Moreover, the policy choice effect on the total schedule is compared through simulated examples and Abu Dhabi’s container terminal case study. The results show that the policy improvements can depend on the problem’s attributes and thus a better policy cannot be generalized.
引用
收藏
页码:435 / 461
页数:26
相关论文
共 50 条
  • [1] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Abou Kasm, Omar
    Diabat, Ali
    Cheng, T. C. E.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) : 435 - 461
  • [2] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148
  • [3] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [4] The Integrated Multi-quay Berth Allocation and Crane Assignment Problem: Formulation and Case Study
    Krimi, Issam
    Benmansour, Rachid
    el Cadi, Abdessamad Ait
    Duvivier, David
    Elhachemi, Nizar
    Deshayes, Laurent
    Ouarrasse, Amine Ait
    [J]. 2018 7TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2018), 2018, : 157 - 161
  • [5] Robust optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Miao, Lixin
    Zhang, Canrong
    Wu, Tao
    Liang, Zhe
    [J]. NAVAL RESEARCH LOGISTICS, 2024, 71 (03) : 452 - 476
  • [6] The Integrated Rescheduling Problem of Berth Allocation and Quay Crane Assignment with Uncertainty
    Zheng, Hongxing
    Wang, Zhaoyang
    Liu, Hong
    [J]. PROCESSES, 2023, 11 (02)
  • [7] A fast approach for the integrated berth allocation and quay crane assignment problem
    Ma, H. L.
    Chan, Felix T. S.
    Chung, S. H.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 (11) : 2076 - 2087
  • [8] An enriched model for the integrated berth allocation and quay crane assignment problem
    Raa, Birger
    Dullaert, Wout
    Van Schaeren, Rowan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (11) : 14136 - 14147
  • [9] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    [J]. IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)
  • [10] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524