Interblock crane deployment in container terminals

被引:0
|
作者
Chung, RK [1 ]
Li, CL
Lin, WQ
机构
[1] Hong Kong Univ Sci & Technol, Dept Ind Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
[2] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
关键词
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of scheduling the movements of cranes in a container storage yard so as to minimize the total unfinished workload at the end of each time period. The problem is formulated as a mixed-integer linear program, and the computational complexity of the problem is analyzed. A Lagrangian decomposition solution procedure is described. A new solution approach, called the successive piecewise-linear approximation method, is also developed. Through computational experiments, we show that our proposed solution methods are both efficient and effective for large-sized problems.
引用
收藏
页码:79 / 93
页数:15
相关论文
共 50 条
  • [1] Interblock crane deployment in container terminals (vol 36, pg 79, 2002)
    Cheung, RK
    Li, CL
    Lin, WQ
    [J]. TRANSPORTATION SCIENCE, 2002, 36 (03) : CP1 - CP1
  • [2] YARD CRANE DEPLOYMENT IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Lau, Meimei
    Tay, Teck Chin
    [J]. PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1735 - 1746
  • [3] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [4] A flexible crane scheduling methodology for container terminals
    Dik, Guvenc
    Kozan, Erhan
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (01) : 64 - 96
  • [5] Yard crane scheduling in port container terminals
    Ng, WC
    Mak, KL
    [J]. APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) : 263 - 276
  • [6] A Method of Quay Crane Scheduling For Container Terminals
    Ning Zhao
    Mi Weijian
    Xue Bao
    [J]. NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 824 - 827
  • [7] A flexible crane scheduling methodology for container terminals
    Guvenc Dik
    Erhan Kozan
    [J]. Flexible Services and Manufacturing Journal, 2017, 29 : 64 - 96
  • [8] A crane scheduling method for port container terminals
    Kim, KH
    Park, YM
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) : 752 - 768
  • [9] A Quay Crane Scheduling Model in Container Terminals
    Tang, Qi
    [J]. ADVANCES IN SWARM INTELLIGENCE, PT 2, PROCEEDINGS, 2010, 6146 : 283 - 290
  • [10] Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
    Chargui, Kaoutar
    Zouadi, Tarik
    El Fallahi, Abdellah
    Reghioui, Mohamed
    Aouam, Tarik
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2021, 154