The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations

被引:36
|
作者
Luis Ponz-Tienda, Jose [1 ]
Pellicer, Eugenio [2 ]
Benlloch-Marco, Javier [3 ]
Andres-Romano, Carlos [4 ]
机构
[1] Univ Los Andes, Dept Civil & Environm Engn, Bogota, Colombia
[2] Univ Politecn Valencia, Sch Civil Engn, Valencia 46022, Spain
[3] Univ Politecn Valencia, Dept Architectural Construct, Valencia 46022, Spain
[4] Univ Politecn Valencia, Dept Business Adm, Valencia 46022, Spain
关键词
NEURAL DYNAMICS MODEL; ACTIVITY NETWORKS; MANAGEMENT; OPTIMIZATION; COST; TIME; CRITICALITY; SIMULATION; VARIABLES; NUMBERS;
D O I
10.1111/mice.12166
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In scheduling, estimations are affected by the imprecision of limited information on future events, and the reduction in the number and level of detail of activities. Overlapping of processes and activities requires the study of their continuity, along with analysis of the risks associated with imprecision. In this line, this article proposes a fuzzy heuristic model for the Project Scheduling Problem with flows and minimal feeding, time and work Generalized Precedence Relations with a realistic approach to overlapping, in which the continuity of processes and activities is allowed in a discretionary way. This fuzzy algorithm handles the balance of process flows, and computes the optimal fragmentation of tasks, avoiding the interruption of the critical path and reverse criticality. The goodness of this approach is tested on several problems found in the literature; furthermore, an example of a 15-story building was used to compare the better performance of the algorithm implemented in Visual Basic for Applications (Excel) over that same example input in Primavera (c) P6 Professional V8.2.0, using five different scenarios.
引用
收藏
页码:872 / 891
页数:20
相关论文
共 50 条
  • [41] Project scheduling problem with fuzzy activity duration times
    Ke, H
    Liu, BD
    2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
  • [42] ON STOCHASTIC SCHEDULING WITH PRECEDENCE RELATIONS AND SWITCHING COSTS
    GLAZEBROOK, KD
    JOURNAL OF APPLIED PROBABILITY, 1980, 17 (04) : 1016 - 1024
  • [43] Single-machine scheduling problem with fuzzy time delays and mixed precedence constraints
    Wu, Hui
    Wang, Bing
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (02) : 2231 - 2244
  • [44] Scheduling activities in project network with feeding precedence relations: an earliest start forward recursion algorithm
    Bianco, Lucio
    Caramia, Massimiliano
    Giordani, Stefano
    Salvatore, Alessio
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 193 - 224
  • [45] Single machine parallel-batching scheduling problem with fuzzy due-date and fuzzy precedence relation
    Li, Xuesong
    Ishii, Hiroaki
    Chen, Minghao
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) : 2707 - 2717
  • [46] Schedule Generation Schemes and Genetic Algorithm for the Scheduling Problem with Skilled Operators and Arbitrary Precedence Relations
    Mencia, Raul
    Sierra, Maria R.
    Mencia, Carlos
    Varela, Ramiro
    PROCEEDINGS OF THE TWENTY-FIFTH INTERNATIONAL CONFERENCE ON AUTOMATED PLANNING AND SCHEDULING, 2015, : 165 - 173
  • [47] Genetic Algorithm for the Project Scheduling Problem with Fuzzy Time Parameters
    Huang, Yilun
    Shou, Yongyi
    Zhang, Linda
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 689 - 693
  • [48] Solving project scheduling problem with the philosophy of fuzzy random programming
    Ke, Hua
    Ma, Weimin
    Ma, Junjie
    FUZZY OPTIMIZATION AND DECISION MAKING, 2012, 11 (03) : 269 - 284
  • [49] Solving project scheduling problem with the philosophy of fuzzy random programming
    Hua Ke
    Weimin Ma
    Junjie Ma
    Fuzzy Optimization and Decision Making, 2012, 11 : 269 - 284
  • [50] Fuzzy project scheduling problem and its hybrid intelligent algorithm
    Ke, Hua
    Liu, Baoding
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 301 - 308