Solving project scheduling problem with the philosophy of fuzzy random programming

被引:15
|
作者
Ke, Hua [1 ]
Ma, Weimin [1 ]
Ma, Junjie [2 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Tongji Univ, Sch Law, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Fuzzy random programming; Fuzzy random simulation; Genetic algorithm; RANDOM-VARIABLES;
D O I
10.1007/s10700-012-9133-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Project scheduling problem is to determine the schedule of allocating resources to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. Due to the complex external environment, this paper considers project scheduling problem with coexisted uncertainty of randomness and fuzziness, in which the philosophy of fuzzy random programming is introduced. Based on different ranking criteria of fuzzy random variables, three types of fuzzy random models are built. Besides, a searching approach by integrating fuzzy random simulations and genetic algorithm is designed for searching the optimal schedules. The goal of the paper is to provide a new method for solving project scheduling problem in hybrid uncertain environments.
引用
收藏
页码:269 / 284
页数:16
相关论文
共 50 条
  • [1] Solving project scheduling problem with the philosophy of fuzzy random programming
    Hua Ke
    Weimin Ma
    Junjie Ma
    Fuzzy Optimization and Decision Making, 2012, 11 : 269 - 284
  • [2] Fuzzy random project scheduling problem
    Ke, Hua
    Liu, Baoding
    Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 427 - 432
  • [3] An Uncertain Random Programming Model for Project Scheduling Problem
    Ke, Hua
    Liu, Huimin
    Tian, Guangdong
    INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS, 2015, 30 (01) : 66 - 79
  • [5] On a method of solving a problem of linear programming with random fuzzy data
    Tver' State Univ, Tver', Russia
    Izv Akad Nauk Teh Kibern, 5 (91-95):
  • [6] Solving resource-constrained project scheduling problem with evolutionary programming
    Sebt, M. H.
    Alipouri, Y.
    Alipouri, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (09) : 1327 - 1335
  • [7] A Dynamic Programming Approach for Solving the IFM Based Project Scheduling Problem
    Tselios, Dimitrios
    Ipsilandis, Pandelis
    Gerogiannis, Vassilis C.
    PROCEEDINGS 41ST EUROMICRO CONFERENCE ON SOFTWARE ENGINEERING AND ADVANCED APPLICATIONS SEAA 2015, 2015, : 127 - 134
  • [8] A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
    Yagub Alipouri
    Mohammad Hassan Sebt
    Abdollah Ardeshir
    Mohammad Hossein Fazel Zarandi
    Operational Research, 2020, 20 : 197 - 217
  • [9] A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem
    Alipouri, Yagub
    Sebt, Mohammad Hassan
    Ardeshir, Abdollah
    Zarandi, Mohammad Hossein Fazel
    OPERATIONAL RESEARCH, 2020, 20 (01) : 197 - 217
  • [10] Solving bi-level programming problem with fuzzy random variable coefficients
    Singh, Vishnu Pratap
    Chakraborty, Debjani
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (01) : 521 - 528