Solving project scheduling problem with the philosophy of fuzzy random programming

被引:15
|
作者
Ke, Hua [1 ]
Ma, Weimin [1 ]
Ma, Junjie [2 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Tongji Univ, Sch Law, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Fuzzy random programming; Fuzzy random simulation; Genetic algorithm; RANDOM-VARIABLES;
D O I
10.1007/s10700-012-9133-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Project scheduling problem is to determine the schedule of allocating resources to achieve the trade-off between the project cost and the completion time. In real projects, the trade-off between the project cost and the completion time, and the uncertainty of the environment are both considerable aspects for managers. Due to the complex external environment, this paper considers project scheduling problem with coexisted uncertainty of randomness and fuzziness, in which the philosophy of fuzzy random programming is introduced. Based on different ranking criteria of fuzzy random variables, three types of fuzzy random models are built. Besides, a searching approach by integrating fuzzy random simulations and genetic algorithm is designed for searching the optimal schedules. The goal of the paper is to provide a new method for solving project scheduling problem in hybrid uncertain environments.
引用
收藏
页码:269 / 284
页数:16
相关论文
共 50 条
  • [31] Solving a log-truck scheduling problem with constraint programming
    El Hachemi, Nizar
    Gendreau, Michel
    Rousseau, Louis-Martin
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2008, 5015 : 293 - 297
  • [32] Solving an outpatient nurse scheduling problem by binary goal programming
    Wang, Sheng-Pen
    Hsieh, Yu-Kuang
    Zhuang, Zheng-Yun
    Ou, Nai-Chia
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2014, 31 (01) : 41 - 50
  • [33] An Effective Solution Approach to Fuzzy Programming with Application to Project Scheduling
    Qianyu Zhang
    Jian Zhou
    Ke Wang
    Athanasios A. Pantelous
    International Journal of Fuzzy Systems, 2018, 20 : 2383 - 2398
  • [34] Solving a Supply-Delivery Scheduling Problem with Constraint Programming
    Giles, Katherine
    van Hoeve, Willem-Jan
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 602 - 617
  • [35] An Effective Solution Approach to Fuzzy Programming with Application to Project Scheduling
    Zhang, Qianyu
    Zhou, Jian
    Wang, Ke
    Pantelous, Athanasios A.
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2018, 20 (08) : 2383 - 2398
  • [36] A fuzzy time-dependent project scheduling problem
    Huang, Wei
    Oh, Sung-Kwun
    Pedrycz, Witold
    INFORMATION SCIENCES, 2013, 246 : 100 - 114
  • [37] Job Shop Scheduling Problem with Fuzzy Random Variables
    Nie, Ling
    Ni, Ting
    2014 SEVENTH INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION (CSO), 2014, : 626 - 630
  • [38] Project scheduling problem with fuzzy activity duration times
    Ke, H
    Liu, BD
    2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
  • [39] Solving the nuclear dismantling project scheduling problem by combining mixed-integer and constraint programming techniques and metaheuristics
    Felix Hübner
    Patrick Gerhards
    Christian Stürck
    Rebekka Volk
    Journal of Scheduling, 2021, 24 : 269 - 290
  • [40] Solving the nuclear dismantling project scheduling problem by combining mixed-integer and constraint programming techniques and metaheuristics
    Hubner, Felix
    Gerhards, Patrick
    Stuerck, Christian
    Volk, Rebekka
    JOURNAL OF SCHEDULING, 2021, 24 (03) : 269 - 290