Project scheduling problem with fuzzy activity duration times

被引:0
|
作者
Ke, H [1 ]
Liu, BD [1 ]
机构
[1] Tsing Hua Univ, Dept Math Sci, Beijing 100084, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper considers a type of project scheduling problem with objective of minimizing the total cost, in which project activities have fuzzy duration times and loan is taken into account in the total cost. According to some optimization goal, a fuzzy chance-constrained programming is built to model the project scheduling problem. Moreover, the technique of fuzzy simulation and genetic algorithm are integrated to design a hybrid intelligent algorithm to solve the fuzzy model. Finally, a simple numerical example is given to illustrate the effectiveness of the algorithm.
引用
收藏
页码:819 / 823
页数:5
相关论文
共 50 条
  • [1] Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times
    Huang, Wei
    Ding, Lixin
    Wen, Bin
    Cao, Buqing
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS, 2009, 5552 : 60 - 69
  • [2] Project scheduling problem with stochastic activity duration times
    Ke, Hua
    Liu, Baoding
    [J]. Proceedings of the Third International Conference on Information and Management Sciences, 2004, 3 : 284 - 289
  • [3] Project scheduling problem with stochastic activity duration times
    Ke, H
    Liu, BD
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (01) : 342 - 353
  • [4] Project-Scheduling Problem With Random Time-Dependent Activity Duration Times
    Huang, Wei
    Ding, Lixin
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2011, 58 (02) : 377 - 387
  • [5] Project scheduling problem with stochastic resource-dependent activity duration
    Zhong, Chunjie
    Yu, Ying
    Jia, YunLang
    [J]. MECHANICAL ENGINEERING, MATERIALS AND ENERGY III, 2014, 483 : 607 - +
  • [6] An Adapted Firefly Algorithm for Product Development Project Scheduling with Fuzzy Activity Duration
    Huang, Minmei
    Yuan, Jijun
    Xiao, Jing
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [7] Fuzzy random project scheduling problem
    Ke, Hua
    Liu, Baoding
    [J]. Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 427 - 432
  • [8] DETERMINATION OF OPTIMAL ACTIVITY DURATION IN PROJECT SCHEDULING
    ELMAGHRA.SE
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING, 1968, 19 (01): : 48 - &
  • [9] PROACTIVE AND REACTIVE SCHEDULING WITH FUZZY ACTIVITY TIMES
    Janczura, Marek
    Kuchta, Dorota
    [J]. UNCERTAINTY MODELING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2012, 7 : 495 - 500
  • [10] A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncertainty of activity duration
    Moradi, Hadi
    Shadrokh, Shahram
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3138 - 3167