共 50 条
- [1] Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS, 2009, 5552 : 60 - 69
- [2] Project scheduling problem with fuzzy activity duration times [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
- [3] Project scheduling problem with stochastic activity duration times [J]. Proceedings of the Third International Conference on Information and Management Sciences, 2004, 3 : 284 - 289
- [5] A fuzzy time-dependent project scheduling problem [J]. INFORMATION SCIENCES, 2013, 246 : 100 - 114
- [6] Project scheduling problem with stochastic resource-dependent activity duration [J]. MECHANICAL ENGINEERING, MATERIALS AND ENERGY III, 2014, 483 : 607 - +
- [7] Scheduling with time-dependent discrepancy times [J]. JOURNAL OF SCHEDULING, 2016, 19 (06) : 737 - 757
- [8] Scheduling with time-dependent discrepancy times [J]. Journal of Scheduling, 2016, 19 : 737 - 757
- [9] SCHEDULING WITH TIME-DEPENDENT EXECUTION TIMES [J]. INFORMATION PROCESSING LETTERS, 1995, 54 (03) : 155 - 156