Project-Scheduling Problem With Random Time-Dependent Activity Duration Times

被引:30
|
作者
Huang, Wei [1 ]
Ding, Lixin [1 ]
机构
[1] Wuhan Univ, State Key Lab Software Engn, Wuhan 430072, Peoples R China
基金
中国国家自然科学基金;
关键词
Genetic optimization; random time-dependent project-scheduling problem (RTPSP); stochastic-programming model; stochastic simulation;
D O I
10.1109/TEM.2010.2063707
中图分类号
F [经济];
学科分类号
02 ;
摘要
In this paper, we introduce a random time-dependent project -scheduling problem (RTPSP), in which activity duration times are represented as randomness as well as time dependence. Under these circumstances, the resulting RTPSP is far more complex when compared with existing project-scheduling problems. The complexity stems identifying the critical path, a core issue when dealing with project-scheduling problems. Considering the critical path, we first show that using "standard" path algorithms (e.g., the well-known Dijkstra method) are not able to arrive at solutions. Subsequently, we propose an approach of handling the critical path of RTPSP. Next, we formulate the RTPSP and present three stochastic-programming models to address various requirements arising within this framework. The proposed models are handled through techniques that combine mechanisms of stochastic simulation and genetic optimization. Stochastic simulation is exploited here to estimate the value of uncertain functions that do not exist in the general project-scheduling problems. Numerical experiments are used to illustrate the effectiveness of the algorithm.
引用
收藏
页码:377 / 387
页数:11
相关论文
共 50 条
  • [1] Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times
    Huang, Wei
    Ding, Lixin
    Wen, Bin
    Cao, Buqing
    [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS, 2009, 5552 : 60 - 69
  • [2] Project scheduling problem with fuzzy activity duration times
    Ke, H
    Liu, BD
    [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
  • [3] Project scheduling problem with stochastic activity duration times
    Ke, Hua
    Liu, Baoding
    [J]. Proceedings of the Third International Conference on Information and Management Sciences, 2004, 3 : 284 - 289
  • [4] Project scheduling problem with stochastic activity duration times
    Ke, H
    Liu, BD
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2005, 168 (01) : 342 - 353
  • [5] A fuzzy time-dependent project scheduling problem
    Huang, Wei
    Oh, Sung-Kwun
    Pedrycz, Witold
    [J]. INFORMATION SCIENCES, 2013, 246 : 100 - 114
  • [6] Project scheduling problem with stochastic resource-dependent activity duration
    Zhong, Chunjie
    Yu, Ying
    Jia, YunLang
    [J]. MECHANICAL ENGINEERING, MATERIALS AND ENERGY III, 2014, 483 : 607 - +
  • [7] Scheduling with time-dependent discrepancy times
    Jaehn, Florian
    Sedding, Helmut A.
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (06) : 737 - 757
  • [8] Scheduling with time-dependent discrepancy times
    Florian Jaehn
    Helmut A. Sedding
    [J]. Journal of Scheduling, 2016, 19 : 737 - 757
  • [9] SCHEDULING WITH TIME-DEPENDENT EXECUTION TIMES
    WOEGINGER, GJ
    [J]. INFORMATION PROCESSING LETTERS, 1995, 54 (03) : 155 - 156
  • [10] Scheduling with Time-Dependent Processing Times
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014