共 50 条
- [2] Project scheduling problem with fuzzy activity duration times [J]. 2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 819 - 823
- [3] Project scheduling problem with stochastic resource-dependent activity duration [J]. MECHANICAL ENGINEERING, MATERIALS AND ENERGY III, 2014, 483 : 607 - +
- [4] Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times [J]. ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS, 2009, 5552 : 60 - 69
- [6] Predetermined intervals for start times of activities in the stochastic project scheduling problem [J]. Annals of Operations Research, 2011, 186 : 429 - 442
- [8] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
- [9] DETERMINATION OF OPTIMAL ACTIVITY DURATION IN PROJECT SCHEDULING [J]. JOURNAL OF INDUSTRIAL ENGINEERING, 1968, 19 (01): : 48 - &