The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations

被引:36
|
作者
Luis Ponz-Tienda, Jose [1 ]
Pellicer, Eugenio [2 ]
Benlloch-Marco, Javier [3 ]
Andres-Romano, Carlos [4 ]
机构
[1] Univ Los Andes, Dept Civil & Environm Engn, Bogota, Colombia
[2] Univ Politecn Valencia, Sch Civil Engn, Valencia 46022, Spain
[3] Univ Politecn Valencia, Dept Architectural Construct, Valencia 46022, Spain
[4] Univ Politecn Valencia, Dept Business Adm, Valencia 46022, Spain
关键词
NEURAL DYNAMICS MODEL; ACTIVITY NETWORKS; MANAGEMENT; OPTIMIZATION; COST; TIME; CRITICALITY; SIMULATION; VARIABLES; NUMBERS;
D O I
10.1111/mice.12166
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In scheduling, estimations are affected by the imprecision of limited information on future events, and the reduction in the number and level of detail of activities. Overlapping of processes and activities requires the study of their continuity, along with analysis of the risks associated with imprecision. In this line, this article proposes a fuzzy heuristic model for the Project Scheduling Problem with flows and minimal feeding, time and work Generalized Precedence Relations with a realistic approach to overlapping, in which the continuity of processes and activities is allowed in a discretionary way. This fuzzy algorithm handles the balance of process flows, and computes the optimal fragmentation of tasks, avoiding the interruption of the critical path and reverse criticality. The goodness of this approach is tested on several problems found in the literature; furthermore, an example of a 15-story building was used to compare the better performance of the algorithm implemented in Visual Basic for Applications (Excel) over that same example input in Primavera (c) P6 Professional V8.2.0, using five different scenarios.
引用
收藏
页码:872 / 891
页数:20
相关论文
共 50 条
  • [21] Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
    Gomes, Helton Cristiano
    das Neves, Francisco de Assis
    Freitas Souza, Marcone Jamilson
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 92 - 104
  • [22] Two Dedicated Parallel Machines Scheduling Problem with Precedence Relations
    Gafarov, Evgeny R.
    Dolgui, Alexandre
    Grimaud, Frederic
    OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 403 - 408
  • [23] SINGLE-MACHINE SCHEDULING PROBLEM WITH FUZZY PRECEDENCE RELATION
    ISHII, H
    TADA, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 87 (02) : 284 - 288
  • [24] Single machine scheduling problem with fuzzy precedence delays and fuzzy processing times
    Xie, Y
    Xie, JY
    Liu, J
    FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, PT 2, PROCEEDINGS, 2005, 3614 : 907 - 910
  • [25] Resource Constrained Project Scheduling with General Precedence Relations Optimized with SAT
    Alves, Rui
    Alvelos, Filipe
    Sousa, Sergio Dinis
    PROGRESS IN ARTIFICIAL INTELLIGENCE, EPIA 2013, 2013, 8154 : 199 - 210
  • [26] Fuzzy random project scheduling problem
    Ke, Hua
    Liu, Baoding
    Proceedings of the Fourth International Conference on Information and Management Sciences, 2005, 4 : 427 - 432
  • [27] A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
    Ismael de Azevedo, Guilherme Henrique
    Pessoa, Artur Alves
    Subramanian, Anand
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 289 (03) : 809 - 824
  • [28] Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints
    Karnebogen, Mareike
    Zimmermann, Juergen
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 173 - 192
  • [29] Genetic algorithms for the scheduling problem with arbitrary precedence relations and skilled operators
    Mencia, Raul
    Sierra, Maria R.
    Mencia, Carlos
    Varela, Ramiro
    INTEGRATED COMPUTER-AIDED ENGINEERING, 2016, 23 (03) : 269 - 285
  • [30] BATCH SCHEDULING PROBLEM WITH DUE-DATE AND FUZZY PRECEDENCE RELATION
    Li, Xuesong
    Ishii, Hiroaki
    Chen, Minghao
    KYBERNETIKA, 2012, 48 (02) : 346 - 356