Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints

被引:0
|
作者
Karnebogen, Mareike [1 ]
Zimmermann, Juergen [1 ]
机构
[1] Tech Univ Clausthal, Inst Management & Econ, Julius Albert Str 2, D-38678 Clausthal Zellerfeld, Germany
关键词
Project scheduling; Generalized precedence constraints; RCPSP/max; Partially renewable resources; Generation schemes; ALGORITHM;
D O I
10.1007/s10479-023-05788-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, new resource types have been established in project scheduling. These include so-called partially renewable resources, whose total capacity applies only to a subset of periods in the planning horizon. In this paper, we consider the extension of the resource-constrained project scheduling problem with those partially renewable resources as well as generalized precedence constraints with the objective of minimizing the project duration (RCPSP/max-pi). For this problem it is known that already the determination of a feasible solution is NP-hard in the strong sense. Hence, we present two different generation schemes that are able to find good feasible solutions in short time for most tested instances. The first one is a construction-based heuristic wherein the activities of the project are scheduled iteratively time- and resource-feasibly. The second one is a relaxation-based generation scheme, in which-starting from the schedule consisting of the earliest start times-resource conflicts are identified and resolved by inserting additional resource constraints.
引用
收藏
页码:173 / 192
页数:20
相关论文
共 50 条
  • [1] A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
    Watermeyer, Kai
    Zimmermann, Juergen
    OR SPECTRUM, 2020, 42 (02) : 427 - 460
  • [2] A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
    Kai Watermeyer
    Jürgen Zimmermann
    OR Spectrum, 2020, 42 : 427 - 460
  • [3] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Ma, Weimin
    Che, Yangyang
    Huang, Hu
    Ke, Hua
    INTERNATIONAL JOURNAL OF MACHINE LEARNING AND CYBERNETICS, 2016, 7 (04) : 613 - 621
  • [4] Resource-constrained project scheduling problem with uncertain durations and renewable resources
    Weimin Ma
    Yangyang Che
    Hu Huang
    Hua Ke
    International Journal of Machine Learning and Cybernetics, 2016, 7 : 613 - 621
  • [5] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556
  • [6] A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations
    Bianco, Lucio
    Caramia, Massimiliano
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 14 - 20
  • [7] A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (01) : 152 - 174
  • [8] An Improved Cuckoo Search Algorithm for Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Jin, Yidong
    Nie, Hui
    Duan, Pengfei
    Yang, Huihua
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 1086 - 1090
  • [9] Ant colony optimization for resource-constrained project scheduling with generalized precedence relations
    Luo, SP
    Wang, C
    Wang, JW
    15TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2003, : 284 - 289
  • [10] Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Su, Zhi-Xiong
    Wei, Han-Ying
    Zou, Xin
    Qi, Jian-Xun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (03)