Generation schemes for the resource-constrained project scheduling problem with partially renewable resources and generalized precedence constraints

被引:0
|
作者
Karnebogen, Mareike [1 ]
Zimmermann, Juergen [1 ]
机构
[1] Tech Univ Clausthal, Inst Management & Econ, Julius Albert Str 2, D-38678 Clausthal Zellerfeld, Germany
关键词
Project scheduling; Generalized precedence constraints; RCPSP/max; Partially renewable resources; Generation schemes; ALGORITHM;
D O I
10.1007/s10479-023-05788-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In recent years, new resource types have been established in project scheduling. These include so-called partially renewable resources, whose total capacity applies only to a subset of periods in the planning horizon. In this paper, we consider the extension of the resource-constrained project scheduling problem with those partially renewable resources as well as generalized precedence constraints with the objective of minimizing the project duration (RCPSP/max-pi). For this problem it is known that already the determination of a feasible solution is NP-hard in the strong sense. Hence, we present two different generation schemes that are able to find good feasible solutions in short time for most tested instances. The first one is a construction-based heuristic wherein the activities of the project are scheduled iteratively time- and resource-feasibly. The second one is a relaxation-based generation scheme, in which-starting from the schedule consisting of the earliest start times-resource conflicts are identified and resolved by inserting additional resource constraints.
引用
收藏
页码:173 / 192
页数:20
相关论文
共 50 条
  • [21] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [22] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [23] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [24] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [25] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Gafarov, Evgeny R.
    Lazarev, Alexander A.
    Werner, Frank
    ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 115 - 130
  • [26] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Evgeny R. Gafarov
    Alexander A. Lazarev
    Frank Werner
    Annals of Operations Research, 2014, 213 : 115 - 130
  • [27] Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
    Gomes, Helton Cristiano
    das Neves, Francisco de Assis
    Freitas Souza, Marcone Jamilson
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 92 - 104
  • [28] A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
    Demeulemeester, EL
    Herroelen, WS
    OPERATIONS RESEARCH, 1997, 45 (02) : 201 - 212
  • [29] Project scheduling under partially renewable resource constraints
    Böttcher, J
    Drexl, A
    Kolisch, R
    Salewski, F
    MANAGEMENT SCIENCE, 1999, 45 (04) : 543 - 559
  • [30] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55