Compressing project to minimize the increased risk and cost

被引:0
|
作者
Chen, Qinglan [1 ]
Chen, Liu [1 ]
Zeng, Xiang-Ting [2 ]
Wei, Chiu-Chi [2 ]
机构
[1] Xiamen Univ Technol, Sch Econ & Management, Xiamen, Peoples R China
[2] Chung Hua Univ, Dept Ind Management, Hsinchu, Taiwan
关键词
duration compression; project management; crashing; fast tracking; project risk; project cost; FAST-TRACKING; MODEL; TIME; OPTIMIZATION; DESIGN;
D O I
10.1177/1063293X221133344
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In a highly competitive market environment, organizations must improve their productivity, reduce production costs and improve management methods, in order to maintain a favorable competitive position. Project factors, such as time, cost and risk are closely linked. If one of those factors is out of control, the progress of the whole project will inevitably be delayed. When the progress of the project is delayed, duration compression measures such as crashing or fast tracking are usually employed to ensure the backward schedule returns to the original plan. However, the implementation of duration compression measures increases the cost and risk of the project. In most previous study of the critical path, only activity time is involved, and cost and risk are not considered. In the present study, a mathematical model is built to solve the optimal duration compression scheme objectives of the minimization of risk and cost. The model is verified by two cases, and the best solution is obtained by using LINGO software and Excel solver. The mathematical model is found to provide the best duration compression scheme for the project, with the least increases in cost and risk.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Decommissioning - five critical steps to minimize both risk and cost
    Barnes, RB
    Electronics Goes Green 2004 (Plus): Driving Forces for Future Electronics, Proceedings, 2004, : 829 - 833
  • [2] Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1447 - 1456
  • [3] Optimizing the Renovation Scheduling of Leased Residential Buildings to Minimize Total Project Cost
    AlOtaibi, Mansour
    El-Rayes, Khaled
    Altuwaim, Ayman
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (07)
  • [4] A fuzzy project scheduling approach to minimize schedule risk for product development
    Wang, JT
    FUZZY SETS AND SYSTEMS, 2002, 127 (02) : 99 - 116
  • [5] Design optimization of hazardous substance storage facilities to minimize project risk
    Bernechea, Esteban J.
    Arnaldos Viger, Josep
    SAFETY SCIENCE, 2013, 51 (01) : 49 - 62
  • [6] Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints
    Rahman, Humyun Fuad
    Servranckx, Tom
    Chakrabortty, Ripon K.
    Vanhoucke, Mario
    El Sawah, Sondoss
    APPLIED SOFT COMPUTING, 2022, 131
  • [7] Resource Constrained Project Proactive Scheduling to Minimize Uncertainty Cost Considering Information handling
    Cui, Xiao
    He, Zhengwen
    Wang, Nengming
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 648 - 653
  • [8] Compressing, storing CO2 could minimize climate change
    Hileman, B
    CHEMICAL & ENGINEERING NEWS, 2005, 83 (40) : 11 - 11
  • [9] The Project Cost Risk Assessment Based On AHP
    Qian, Huachao
    Wang, Qi
    Liu, Xiaowen
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 1189 - 1191
  • [10] The Risk Analysis and Evaluation of Project Construction Cost
    Cao, Duna
    Zhu, Binmei
    2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL VII, 2010, : 213 - 216