共 50 条
- [1] Decommissioning - five critical steps to minimize both risk and cost Electronics Goes Green 2004 (Plus): Driving Forces for Future Electronics, Proceedings, 2004, : 829 - 833
- [7] Resource Constrained Project Proactive Scheduling to Minimize Uncertainty Cost Considering Information handling PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 648 - 653
- [9] The Project Cost Risk Assessment Based On AHP PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT SCIENCE (ITMS 2015), 2015, 34 : 1189 - 1191
- [10] The Risk Analysis and Evaluation of Project Construction Cost 2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL VII, 2010, : 213 - 216