Compressing project to minimize the increased risk and cost

被引:0
|
作者
Chen, Qinglan [1 ]
Chen, Liu [1 ]
Zeng, Xiang-Ting [2 ]
Wei, Chiu-Chi [2 ]
机构
[1] Xiamen Univ Technol, Sch Econ & Management, Xiamen, Peoples R China
[2] Chung Hua Univ, Dept Ind Management, Hsinchu, Taiwan
关键词
duration compression; project management; crashing; fast tracking; project risk; project cost; FAST-TRACKING; MODEL; TIME; OPTIMIZATION; DESIGN;
D O I
10.1177/1063293X221133344
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In a highly competitive market environment, organizations must improve their productivity, reduce production costs and improve management methods, in order to maintain a favorable competitive position. Project factors, such as time, cost and risk are closely linked. If one of those factors is out of control, the progress of the whole project will inevitably be delayed. When the progress of the project is delayed, duration compression measures such as crashing or fast tracking are usually employed to ensure the backward schedule returns to the original plan. However, the implementation of duration compression measures increases the cost and risk of the project. In most previous study of the critical path, only activity time is involved, and cost and risk are not considered. In the present study, a mathematical model is built to solve the optimal duration compression scheme objectives of the minimization of risk and cost. The model is verified by two cases, and the best solution is obtained by using LINGO software and Excel solver. The mathematical model is found to provide the best duration compression scheme for the project, with the least increases in cost and risk.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] RETRACTED: The Path Choice to Minimize the Project Risk Based on the Possible Degree (Retracted Article)
    Zhou Qihai
    Sun Xiezhi
    Li Zhongjun
    Wang Jing
    Han Zai-xing
    Li Yan
    Xia Yuanyuan
    2009 INTERNATIONAL FORUM ON INFORMATION TECHNOLOGY AND APPLICATIONS, VOL 3, PROCEEDINGS, 2009, : 53 - +
  • [22] Selecting risk response strategies to minimize human errors in a design project for factories of the future
    Jin, Guangying
    Sperandio, Severine
    Girard, Philippe
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 225
  • [23] Application study of project cost risk analysis for urban light railway project
    Wang Zhenqiang
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 1358 - 1363
  • [24] Methods and applications of risk analysis on construction project cost
    Cheng Dewen
    Wu Yuhua
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 98 - 102
  • [25] Project risk allocation through contingent cost allocation
    Tanimoto, K
    Okada, N
    Tatano, H
    SMC 2000 CONFERENCE PROCEEDINGS: 2000 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOL 1-5, 2000, : 512 - 517
  • [26] Cost & efficient decision analysis project risk management
    Li, JY
    Qiu, WH
    Cheng, QY
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2304 - 2310
  • [27] The study on Risk of Project Cost Based on The Experimental Simulation
    Zheng, Xie
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 1044 - 1046
  • [28] Research on Cost Risk identification of Metallurgical EPC Project
    Yin, Zhiguo
    Li, Huimin
    APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 1521 - 1524
  • [29] Managing cost overrun risk in project funding allocation
    Tseng, CL
    Lin, KY
    Sundararajan, SK
    ANNALS OF OPERATIONS RESEARCH, 2005, 135 (01) : 127 - 153
  • [30] Managing Cost Overrun Risk in Project Funding Allocation
    Chung-Li Tseng
    Kyle Y. Lin
    Satheesh K. Sundararajan
    Annals of Operations Research, 2005, 135 : 127 - 153