Compressing project to minimize the increased risk and cost

被引:0
|
作者
Chen, Qinglan [1 ]
Chen, Liu [1 ]
Zeng, Xiang-Ting [2 ]
Wei, Chiu-Chi [2 ]
机构
[1] Xiamen Univ Technol, Sch Econ & Management, Xiamen, Peoples R China
[2] Chung Hua Univ, Dept Ind Management, Hsinchu, Taiwan
关键词
duration compression; project management; crashing; fast tracking; project risk; project cost; FAST-TRACKING; MODEL; TIME; OPTIMIZATION; DESIGN;
D O I
10.1177/1063293X221133344
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In a highly competitive market environment, organizations must improve their productivity, reduce production costs and improve management methods, in order to maintain a favorable competitive position. Project factors, such as time, cost and risk are closely linked. If one of those factors is out of control, the progress of the whole project will inevitably be delayed. When the progress of the project is delayed, duration compression measures such as crashing or fast tracking are usually employed to ensure the backward schedule returns to the original plan. However, the implementation of duration compression measures increases the cost and risk of the project. In most previous study of the critical path, only activity time is involved, and cost and risk are not considered. In the present study, a mathematical model is built to solve the optimal duration compression scheme objectives of the minimization of risk and cost. The model is verified by two cases, and the best solution is obtained by using LINGO software and Excel solver. The mathematical model is found to provide the best duration compression scheme for the project, with the least increases in cost and risk.
引用
收藏
页数:11
相关论文
共 50 条
  • [31] Risk effect on offshore systems development project cost
    DeHondt G., II
    Nezle G.
    Journal of Computing and Information Technology, 2010, 18 (02) : 111 - 120
  • [32] An optimization algorithm to minimize the life cycle cost of implementing an aquifer remediation project - Theory and case example
    Deschaine, LM
    Ahlfeld, DP
    O'Brien, D
    PROCEEDINGS OF THE SIMULATORS INTERNATIONAL XV, 1998, 30 (03): : 53 - 58
  • [33] Multi-objective optimization of work package scheme problem to minimize project carbon emissions and cost
    Zhang, Yaning
    Li, Xiao
    Teng, Yue
    Shen, Geoffrey Q.P.
    Bai, Sijun
    Computers and Industrial Engineering, 2025, 200
  • [34] SEQUENCING TO MINIMIZE THE MAXIMUM JOB COST
    MONMA, CL
    OPERATIONS RESEARCH, 1980, 28 (04) : 942 - 951
  • [35] ALLOCATION OF TOLERANCES TO MINIMIZE COST OF ASSEMBLY
    SPOTTS, MF
    MECHANICAL ENGINEERING, 1973, 95 (02) : 48 - 48
  • [36] PARTITIONING A MATRIX TO MINIMIZE THE MAXIMUM COST
    MINGOZZI, A
    RICCIARDELLI, S
    SPADONI, M
    DISCRETE APPLIED MATHEMATICS, 1995, 62 (1-3) : 221 - 248
  • [37] ALLOCATION OF TOLERANCES TO MINIMIZE COST OF ASSEMBLY
    SPOTTS, MF
    JOURNAL OF ENGINEERING FOR INDUSTRY-TRANSACTIONS OF THE ASME, 1973, 95 (03): : 762 - 764
  • [38] Partitioning a matrix to minimize the maximum cost
    1600, Elsevier Science B.V., Amsterdam, Netherlands (62): : 1 - 3
  • [39] BUNCHING THEORY APPLIED TO MINIMIZE COST
    RINGWALD, RC
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1987, 113 (02): : 321 - 326
  • [40] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129