Compressing project to minimize the increased risk and cost

被引:0
|
作者
Chen, Qinglan [1 ]
Chen, Liu [1 ]
Zeng, Xiang-Ting [2 ]
Wei, Chiu-Chi [2 ]
机构
[1] Xiamen Univ Technol, Sch Econ & Management, Xiamen, Peoples R China
[2] Chung Hua Univ, Dept Ind Management, Hsinchu, Taiwan
关键词
duration compression; project management; crashing; fast tracking; project risk; project cost; FAST-TRACKING; MODEL; TIME; OPTIMIZATION; DESIGN;
D O I
10.1177/1063293X221133344
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In a highly competitive market environment, organizations must improve their productivity, reduce production costs and improve management methods, in order to maintain a favorable competitive position. Project factors, such as time, cost and risk are closely linked. If one of those factors is out of control, the progress of the whole project will inevitably be delayed. When the progress of the project is delayed, duration compression measures such as crashing or fast tracking are usually employed to ensure the backward schedule returns to the original plan. However, the implementation of duration compression measures increases the cost and risk of the project. In most previous study of the critical path, only activity time is involved, and cost and risk are not considered. In the present study, a mathematical model is built to solve the optimal duration compression scheme objectives of the minimization of risk and cost. The model is verified by two cases, and the best solution is obtained by using LINGO software and Excel solver. The mathematical model is found to provide the best duration compression scheme for the project, with the least increases in cost and risk.
引用
收藏
页数:11
相关论文
共 50 条
  • [41] Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
    Emad Abdelbasset
    Abbas Hassan
    Nabil H. Amer
    Yasser A. Khalifa
    Innovative Infrastructure Solutions, 2023, 8
  • [42] The Cost of the Construction Project Risk Management and Optimize the Allocation of Resources
    Xu, Qiu-Yue
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING, 2014, 7 : 550 - 555
  • [43] Impact of political risk on construction cost in PPP project in KSA
    Alfraidi, Yahya
    Alzahrani, Saleh Mohammed
    Binsarra, Fawaz
    Abdelhafez, Mohamed Hssan Hassan
    Noaime, Emad Mohamed
    Mohamed, Mohamed Ahmed Said
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2020, 7 (05): : 6 - 11
  • [44] Which Risk Management Is Most Crucial for Controlling Project Cost?
    Jung, Wooyong
    Han, Seung H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (05)
  • [45] Optimizing the portfolio of road project stakeholders with cost and risk approach
    Dadpour, Mohammadhossein
    Shakeri, Eghbal
    Nazari, Ahad
    Moghadas Nejad, Fereidoon
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (07) : 722 - 733
  • [46] Analysis and Evaluation of Project Cost Risk Based on BP Algorithm
    Zhu, Binmei
    Zhang, Hao
    Wang, Xujia
    ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 264 - 270
  • [47] Project risk evaluation by means of Cost-Benefit method
    Startiene, Grazina
    Lapinskas, Arunas
    Remeikiene, Rita
    CHANGES IN SOCIAL AND BUSINESS ENVIRONMENT, PROCEEDINGS, 2007, : 266 - 272
  • [48] Cost risk management of key chain in engineering construction project
    Wu, Yunna
    Mao, Chunyu
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT AND COMPUTING TECHNOLOGY, 2015, 30 : 1595 - 1600
  • [49] Cost analysis and risk supervision of project in electric power construction
    Gu Zheng
    Lu Tianqi
    Ma Qiang
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE, EDUCATION TECHNOLOGY, ARTS, SOCIAL SCIENCE AND ECONOMICS (MSETASSE-16), 2016, 85 : 1544 - 1547
  • [50] Cost-time-risk diagram: Project planning and management
    Land Capital Group, Park City, UT
    不详
    不详
    Cost Eng (Morgantown WVa), 2006, 11 (12-18):