共 50 条
- [2] Resource Constrained Project Proactive Scheduling to Minimize Uncertainty Cost Considering Information handling [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 648 - 653
- [3] SCHEDULING JOBS TO MINIMIZE TOTAL-COST [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 74 (01) : 111 - 119
- [7] Online scheduling to minimize total weighted (modified) earliness and tardiness cost [J]. Journal of Scheduling, 2021, 24 : 431 - 446
- [8] Multiple Customers/Transporters Integrated Scheduling Problem to Minimize the Total Cost [J]. IFAC PAPERSONLINE, 2016, 49 (12): : 892 - 897