Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost

被引:2
|
作者
Hassan, Abbas [1 ]
El-Rayes, Khaled [2 ]
Attalla, Mohamed [3 ]
机构
[1] Mil Tech Coll, Dept Civil Engn, Cairo, Egypt
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL USA
[3] Univ Illinois, Facil & Serv, Urbana, IL USA
关键词
Repetitive construction projects; linear scheduling; Monte Carlo simulation; uncertainty; optimization; genetic algorithms; GENETIC ALGORITHM; MODEL; LOB;
D O I
10.1080/15623599.2021.1975078
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering risk and uncertainty during the scheduling optimization of repetitive construction projects is a challenging task. This article presents the development of a novel multi-objective stochastic scheduling optimization model for minimizing the expected project duration and cost of repetitive construction projects. The developed model integrated Monte Carlo simulation with a multi-objective genetic algorithm to: (1) consider uncertainties associated with the production rates of the construction crews; and (2) identify an optimal crew formation and crew deployment date for each activity that minimize the project duration and cost. The performance of the developed model was analyzed using a real-life case study that highlighted the novel model capabilities in generating a set of optimal trade-off solutions between expected project duration and cost while considering all uncertainties in crew production rates. These novel capabilities of the developed model enable construction planners to identify and implement an optimal resource utilization plan that account for inherent project risks.
引用
收藏
页码:1447 / 1456
页数:10
相关论文
共 50 条
  • [1] Optimization of Stochastic Repetitive Construction Projects: Minimizing Duration Uncertainties
    Abosamra, Hussein
    ElSayad, Mohamed A.
    Eid, Mohamed S.
    Elhakeem, Ahmed
    [J]. COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2024, : 180 - 188
  • [2] Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
    Emad Abdelbasset
    Abbas Hassan
    Nabil H. Amer
    Yasser A. Khalifa
    [J]. Innovative Infrastructure Solutions, 2023, 8
  • [3] Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects
    Abdelbasset, Emad
    Hassan, Abbas
    Amer, Nabil H.
    Khalifa, Yasser A.
    [J]. INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2023, 8 (11)
  • [4] SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION
    MOSELHI, O
    ELRAYES, K
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04): : 681 - 697
  • [5] Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost
    Altuwaim, Ayman
    El-Rayes, Khaled
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)
  • [6] Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units
    Monghasemi, Shahryar
    Abdallah, Moatassem
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [7] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [8] REPNET: project scheduling and workflow optimization for Construction Projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 9 - 20
  • [9] Optimizing Financing Cost in Construction Projects with Fixed Project Duration
    Alavipour, S. M. Reza
    Arditi, David
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)
  • [10] Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews
    Monghasemi, Shahryar
    Abdallah, Moatassem
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 461 - 471