Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost

被引:2
|
作者
Hassan, Abbas [1 ]
El-Rayes, Khaled [2 ]
Attalla, Mohamed [3 ]
机构
[1] Mil Tech Coll, Dept Civil Engn, Cairo, Egypt
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL USA
[3] Univ Illinois, Facil & Serv, Urbana, IL USA
关键词
Repetitive construction projects; linear scheduling; Monte Carlo simulation; uncertainty; optimization; genetic algorithms; GENETIC ALGORITHM; MODEL; LOB;
D O I
10.1080/15623599.2021.1975078
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Considering risk and uncertainty during the scheduling optimization of repetitive construction projects is a challenging task. This article presents the development of a novel multi-objective stochastic scheduling optimization model for minimizing the expected project duration and cost of repetitive construction projects. The developed model integrated Monte Carlo simulation with a multi-objective genetic algorithm to: (1) consider uncertainties associated with the production rates of the construction crews; and (2) identify an optimal crew formation and crew deployment date for each activity that minimize the project duration and cost. The performance of the developed model was analyzed using a real-life case study that highlighted the novel model capabilities in generating a set of optimal trade-off solutions between expected project duration and cost while considering all uncertainties in crew production rates. These novel capabilities of the developed model enable construction planners to identify and implement an optimal resource utilization plan that account for inherent project risks.
引用
收藏
页码:1447 / 1456
页数:10
相关论文
共 50 条
  • [21] Stochastic Earthmoving Fleet Arrangement Optimization Considering Project Duration and Cost
    Mohsenijam, Arash
    Mahdavian, Amirsaman
    Shojaei, Alireza
    [J]. MODELLING, 2020, 1 (02): : 156 - 174
  • [22] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Francisco Moreno
    Francisco Orozco
    Omar Rojas
    Bolivar Senior
    Mani Poshdar
    Eric Forcael
    [J]. KSCE Journal of Civil Engineering, 2020, 24 : 1671 - 1682
  • [23] SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW
    Tomczak, Michal
    Jaskowski, Piotr
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (06) : 422 - 442
  • [24] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects
    Moos, Michael
    Velten, Sebastian
    Weiss, Christian
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
  • [25] A Fixed Start Scheduling Approach for Repetitive Construction Projects
    Moreno, Francisco
    Orozco, Francisco
    Rojas, Omar
    Senior, Bolivar
    Poshdar, Mani
    Forcael, Eric
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (6) : 1671 - 1682
  • [26] Construction Project Cost and Duration Optimization Using Artificial Neural Network
    Gopal, M.
    Kumar, D. Rupesh
    [J]. AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 433 - 444
  • [27] Cost optimization in projects with repetitive nonserial activities
    Hegazy, T
    Wassef, N
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03): : 183 - 191
  • [28] Multiobjective optimization in Linear Repetitive Project scheduling
    Pandelis G. Ipsilandis
    [J]. Operational Research, 2006, 6 (3)
  • [29] ENGINEERING PROJECT SCHEDULING AND CONTROL FOR SHORT DURATION PROJECTS
    WHITE, AR
    [J]. MECHANICAL ENGINEERING, 1972, 94 (04): : 64 - &
  • [30] Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects
    Heravi, Gholamreza
    Faeghi, Shiva
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 275 - 283