共 50 条
- [1] Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects [J]. International Journal of Civil Engineering, 2021, 19 : 805 - 822
- [2] Multi-objective Stochastic Time-cost-quality Optimization for Construction Projects Based on the Reliability Theory [J]. KSCE Journal of Civil Engineering, 2023, 27 : 4545 - 4556
- [6] Three Dimensional Time, Cost and Quality Tradeoff Optimization in Project Decision Making [J]. MATERIALS SCIENCE AND INFORMATION TECHNOLOGY, PTS 1-8, 2012, 433-440 : 5746 - +
- [9] Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach [J]. International Journal of Environmental Science and Technology, 2021, 18 : 631 - 646
- [10] Research on Time-Cost Optimization Model of Construction Projects [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +