Multiobjective optimization in Linear Repetitive Project scheduling

被引:0
|
作者
Pandelis G. Ipsilandis
机构
[1] Technological Educational Institute,Department of Project Management
关键词
Linear Projects; Linear Programming; Scheduling;
D O I
10.1007/BF02941255
中图分类号
学科分类号
摘要
The Critical Path Method (CPM) and the Repetitive Scheduling Method (RSM) are the most often used tools for the planning, scheduling and control Linear Repetitive Projects (LRPs). CPM focuses mostly on project’s duration and critical activities, while RSM focuses on resource continuity. In this paper we present a linear programming approach to address the multi objective nature of decisions construction managers face in scheduling LRPs. The Multi Objective Linear Programming model (MOLP-LRP) is a parametric model that can optimize a schedule in terms of duration, work-breaks, unit completion time and respective costs, while at the same time the LP range sensitivity analysis can provide useful information regarding cost tradeoffs between delay, work-break and unit delivery costs. MOLPS-LRP can generate alternative schedules based on the relative magnitude and importance of different cost elements. In this sense it provides managers with the capability to consider alternative schedules besides those defined by minimum duration (CPM) or minimum resource work-breaks (RSM). Demonstrative results and analysis are provided through a well known in the literature case study example.
引用
收藏
相关论文
共 50 条
  • [1] Multiobjective linear programming model for scheduling linear repetitive projects
    Ipsilandis, Pandelis G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (06) : 417 - 424
  • [2] Productivity scheduling method compared to linear and repetitive project scheduling methods
    Lucko, Gunnar
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (09) : 711 - 720
  • [3] Scenario-oriented repetitive project scheduling optimization
    Hu, Zhiyuan
    Wang, Futian
    Tang, Yuanjie
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (10) : 1239 - 1273
  • [4] DSS FOR MULTIOBJECTIVE PROJECT SCHEDULING
    SLOWINSKI, R
    SONIEWICKI, B
    WEGLARZ, J
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 79 (02) : 220 - 229
  • [5] Linear Scheduling Optimization Model for Planning Repetitive Construction Projects
    Monghasemi, Shahryar
    Abdallah, Moatassem
    Clevenger, Caroline
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1129 - 1138
  • [6] Time-cost optimization in repetitive project scheduling with limited resources
    Zou, Xin
    Zhang, Lihui
    Zhang, Qian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (02) : 669 - 701
  • [7] Multiobjective Optimization for Nurse Scheduling
    Yin, Peng-Yeng
    Chao, Chih-Chiang
    Chiang, Ya-Tzu
    [J]. ADVANCES IN SWARM INTELLIGENCE, PT II, 2011, 6729 : 66 - 73
  • [8] Dynamic Multiobjective Software Project Scheduling Optimization Method Based on Firework Algorithm
    Cheng, Jian
    Ji, Jianjiao
    Guo, Yi-nan
    Ji, Junhua
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [9] Linear Optimization Model for Scheduling Repetitive Construction Projects with Multiple Crews
    Monghasemi, Shahryar
    Abdallah, Moatassem
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 461 - 471
  • [10] Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost
    Hassan, Abbas
    El-Rayes, Khaled
    Attalla, Mohamed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (09) : 1447 - 1456