DSS FOR MULTIOBJECTIVE PROJECT SCHEDULING

被引:77
|
作者
SLOWINSKI, R
SONIEWICKI, B
WEGLARZ, J
机构
[1] Institute of Computing Science, Technical University of Poznań
关键词
DECISION SUPPORT SYSTEM; PROJECT SCHEDULING; MULTIPLE OBJECTIVES; INTERACTIVE METHOD; SIMULATED ANNEALING; AGRICULTURAL PROJECT;
D O I
10.1016/0377-2217(94)90353-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper presents a decision support system (DSS) for multiobjective project scheduling under multiple-category resource constraints. It handles quite a general class of nonpreemptive scheduling problems with renewable, nonrenewable and doubly-constrained resources, multiple performing modes of activities, precedence constraints in the form of an activity network and multiple project performance criteria of time and cost type. The DSS is based on three kinds of heuristics: parallel priority rules, simulated annealing and branch-and-bound. The last algorithm can even yield exact solutions when sufficient processing time is available. Some parts of the system are interactive, in particular, the search for the best compromise schedule. Graphical facilities enable a thorough evaluation of feasible schedules. Methodological foundations of the system and the algorithms used in the calculation phase are first explained. Then, a functional description of the system is made. The last part presents results of three test problems, in particular, an agricultural problem including 30 activities, multiple objectives and multiple-category resources.
引用
收藏
页码:220 / 229
页数:10
相关论文
共 50 条
  • [1] MIPS - A DSS FOR MULTIOBJECTIVE INTERACTIVE PROJECT SCHEDULING
    RYS, T
    STANEK, R
    ZIEMBLA, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 79 (02) : 196 - 207
  • [2] RESOURCE ASSIGNMENT IN A DSS FOR PROJECT SCHEDULING
    SERAFINI, P
    SPERANZA, MG
    [J]. LECTURE NOTES IN ECONOMICS AND MATHEMATICAL SYSTEMS, 1991, 351 : 254 - 265
  • [3] Multiobjective optimization in Linear Repetitive Project scheduling
    Pandelis G. Ipsilandis
    [J]. Operational Research, 2006, 6 (3)
  • [4] Using metaheuristics in multiobjective resource constrained project scheduling
    Viana, A
    de Sousa, JP
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) : 359 - 374
  • [5] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    [J]. SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [6] On an expert system with multicriteria Tabu Search for multiobjective project scheduling
    Nabrzyski, J
    Weglarz, J
    [J]. ETFA '97 - 1997 IEEE 6TH INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION PROCEEDINGS, 1997, : 287 - 291
  • [7] A DSS Solution for Integrated Automated Bidding, Subcontractor Selection and Project Scheduling
    Pakgohar, Alireza
    Childe, Stephen J.
    Zhang, David Z.
    [J]. DECISION SUPPORT SYSTEMS II - RECENT DEVELOPMENTS APPLIED TO DSS NETWORK ENVIRONMENTS, 2013, 164 : 72 - 85
  • [8] Dynamic Multiobjective Software Project Scheduling Optimization Method Based on Firework Algorithm
    Cheng, Jian
    Ji, Jianjiao
    Guo, Yi-nan
    Ji, Junhua
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [9] MULTIOBJECTIVE LINEAR-PROGRAMMING - ANOTHER DSS
    DROR, M
    SHOVAL, P
    YELLIN, A
    [J]. DECISION SUPPORT SYSTEMS, 1991, 7 (03) : 221 - 232
  • [10] MULTIOBJECTIVE FLOWSHOP SCHEDULING
    DANIELS, RL
    CHAMBERS, RJ
    [J]. NAVAL RESEARCH LOGISTICS, 1990, 37 (06) : 981 - 995