The Cost Monitoring of Construction Projects Through Earned Value Analysis

被引:0
|
作者
Khamidi, Mohd Faris [1 ]
Khan, Waris Ali [1 ]
Idrus, Arazi [1 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil Engn, Tronoh 31750, Perak, Malaysia
来源
关键词
cost monitoring; earned value analysis; construction cost management;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase, it is the prime responsibility of project managers to monitor cost and avoid any overruns to maintain the cost baseline. Cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not portray the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost management of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional technique that compares the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost management by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.
引用
收藏
页码:129 / 133
页数:5
相关论文
共 50 条
  • [1] Applying Earned Value to Construction Projects
    Al-Fadhli, Suaad Khaleel, I
    Al-Bazaz, Shahlaa Hikmat
    4TH INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, 2020, 737
  • [2] Earned value-based performance monitoring of facility construction projects
    De Marco, Alberto
    Narbaev, Timur
    JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (01) : 69 - +
  • [3] Simplified Earned Value Analysis Method for Highway Construction Projects
    Son, Junghye
    Khwaja, Nabeel
    Milligan, Duane S. S.
    Honey, Brenan D. D.
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (10) : 301 - 310
  • [4] Monitoring software projects with earned value analysis and use case point
    Li, Jinhua
    Ma, Zhibing
    Dong, Huanzhen
    7TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE IN CONJUNCTION WITH 2ND IEEE/ACIS INTERNATIONAL WORKSHOP ON E-ACTIVITY, PROCEEDINGS, 2008, : 475 - 480
  • [5] Improved cost monitoring and control through the Earned Value Management System
    Hunter, Howard
    Fitzgerald, Richard
    Barlow, Dewey
    ACTA ASTRONAUTICA, 2014, 93 : 497 - 500
  • [6] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [7] Increasing earned value analysis efficiency for IT projects
    Stanek, Stanislaw
    Kuchta, Dorota
    JOURNAL OF DECISION SYSTEMS, 2020, 29 (sup1) : 352 - 360
  • [8] Conditions of success for earned value analysis in projects
    Bryde, David
    Unterhitzenberger, Christine
    Joby, Roger
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (03) : 474 - 484
  • [9] The application, modification & extension of earned value management in construction projects
    Zhang, Xiaoli
    Lin, Zefu
    Ji, Xue
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 955 - 958
  • [10] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428