Applying Earned Value to Construction Projects

被引:0
|
作者
Al-Fadhli, Suaad Khaleel, I [1 ]
Al-Bazaz, Shahlaa Hikmat [2 ]
机构
[1] Univ Technol Baghdad, Architectural Engn Dept, Baghdad, Iraq
[2] Univ Technol Baghdad, Civil Engn Dept, Baghdad, Iraq
来源
4TH INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING | 2020年 / 737卷
关键词
MANAGEMENT;
D O I
10.1088/1757-899X/737/1/012041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects are increasingly expanding and being more complex over the time, which needs special requirements at every stage of the life cycle of projects. Each project has specific characteristics and requirements that distinguish from others. The responsibilities and tasks of the parties which, involved in the project (the employer, the designer and the contractor) at each stage vary according to the projects and the implementation methods. The follow up and control of costs during implementation is one of the duties of the engineering department to know the real costs resulting from the implementation of the work. Therefore, the process of controlling costs is a continuous and substantial process, and it indicates the efficiency and success of management. EVM "earned value management is one of the tools which is used to track the progress of work performance in projects. It can indicates the deviations and variances in cost and time schedule of the projects in this research EVM was applied on a project of an administrative building. The application, which was on a specific status date, showed that this method is applicable to track the progress of the project performance, and gave a logical results that used to understand the tendency of work performance, also to predict the future performance.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [2] Simplified Earned Value Analysis Method for Highway Construction Projects
    Son, Junghye
    Khwaja, Nabeel
    Milligan, Duane S. S.
    Honey, Brenan D. D.
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (10) : 301 - 310
  • [3] The application, modification & extension of earned value management in construction projects
    Zhang, Xiaoli
    Lin, Zefu
    Ji, Xue
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 955 - 958
  • [4] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [5] The Cost Monitoring of Construction Projects Through Earned Value Analysis
    Khamidi, Mohd Faris
    Khan, Waris Ali
    Idrus, Arazi
    ECONOMICS AND FINANCE RESEARCH, 2011, 4 : 129 - 133
  • [6] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís Ponz-Tienda
    Eugenio Pellicer
    Víctor Yepes
    Journal of Zhejiang University SCIENCE A, 2012, 13 : 56 - 68
  • [7] Control of construction projects using the Earned Value Method - case study
    Araszkiewicz, Krystyna
    Bochenek, Magdalena
    OPEN ENGINEERING, 2019, 9 (01): : 186 - 195
  • [8] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Jos Lus PONZTIENDA
    Eugenio PELLICER
    Vctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, 13 (01) : 56 - 68
  • [9] Randomized Earned Value Method for the rolling assessment of construction projects advancement
    Kasprowicz, Tadeusz
    Starczyk-Kolbyk, Anna
    ARCHIVES OF CIVIL ENGINEERING, 2022, 68 (02) : 501 - 520
  • [10] Calculating cumulative inefficiency using earned value management in construction projects
    Lee, Jae-Seob
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2015, 42 (04) : 222 - 232