The application, modification & extension of earned value management in construction projects

被引:0
|
作者
Zhang, Xiaoli [1 ]
Lin, Zefu [1 ]
Ji, Xue [1 ]
机构
[1] Cent Univ Finance & Econ, Sch Management Sci & Engn, Beijing, Peoples R China
关键词
project management; project implementation; control; earned value management; quality control;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The Earned Value Management, as an integrated technique of project monitoring and control, has been increasingly used in managing scope, time and cost, the three key factors for project success. However, it so far has not been extended to assess and monitor quality, which is widely recognized as another key success factor. The goal of this paper is to redefine two of the three major variables used in calculating cost and schedule variances, and to propose a new variable and a new measure-quality variance, on the basis of a discussion of what should be monitored in the project control process and an analysis of EVM's flaws identified in a field study.
引用
下载
收藏
页码:955 / 958
页数:4
相关论文
共 50 条
  • [1] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [2] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [3] Applying Earned Value to Construction Projects
    Al-Fadhli, Suaad Khaleel, I
    Al-Bazaz, Shahlaa Hikmat
    4TH INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, 2020, 737
  • [4] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís Ponz-Tienda
    Eugenio Pellicer
    Víctor Yepes
    Journal of Zhejiang University SCIENCE A, 2012, 13 : 56 - 68
  • [5] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Jos Lus PONZTIENDA
    Eugenio PELLICER
    Vctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, 13 (01) : 56 - 68
  • [6] Calculating cumulative inefficiency using earned value management in construction projects
    Lee, Jae-Seob
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2015, 42 (04) : 222 - 232
  • [7] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís PONZ-TIENDA
    Eugenio PELLICER
    Víctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, (01) : 56 - 68
  • [8] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Luis Ponz-Tienda, Jose
    Pellicer, Eugenio
    Yepes, Victor
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2012, 13 (01): : 56 - 68
  • [9] Earned Value Management Software Projects
    Hanna, Robert A.
    SMC-IT 2009: THIRD IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY, PROCEEDINGS, 2009, : 297 - 304
  • [10] Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections
    Proano-Narvaez, Mayra
    Flores-Vazquez, Carlos
    Vasquez Quiroz, Pablo
    Avila-Calle, Marco
    BUILDINGS, 2022, 12 (03)