Earned Value Management System in Indonesian Construction Projects

被引:1
|
作者
Priyo, Mandiyo [1 ]
机构
[1] Univ Muhammadiyah Yogyakarta, Dept Civil Engn, Fac Engn, Kasihan 55183, Bantul, Indonesia
来源
关键词
Earned value management; construction; project management;
D O I
10.30880/ijie.2021.13.03.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements to assess project performance and progress. It involves integrating the three critical elements of the project covering schedule, work scope, and cost. Various benefits are associated with the use of EVM in project management. This research aims to analyze four units of building construction projects using the EVM method consisting of an analysis of project performance, estimation of cost, and time for project completion, and planning estimation analysis against project completion. The results revealed that from the aspect of time, three buildings were completed ahead of schedule, and another one was behind schedule. In terms of cost, three buildings cost lower than the estimated budget, while one other building was higher.
引用
收藏
页码:37 / 45
页数:9
相关论文
共 50 条
  • [1] The application, modification & extension of earned value management in construction projects
    Zhang, Xiaoli
    Lin, Zefu
    Ji, Xue
    [J]. Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 955 - 958
  • [2] Applying Earned Value to Construction Projects
    Al-Fadhli, Suaad Khaleel, I
    Al-Bazaz, Shahlaa Hikmat
    [J]. 4TH INTERNATIONAL CONFERENCE ON BUILDINGS, CONSTRUCTION AND ENVIRONMENTAL ENGINEERING, 2020, 737
  • [3] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís Ponz-Tienda
    Eugenio Pellicer
    Víctor Yepes
    [J]. Journal of Zhejiang University SCIENCE A, 2012, 13 : 56 - 68
  • [4] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Jos Lus PONZTIENDA
    Eugenio PELLICER
    Vctor YEPES
    [J]. Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, 13 (01) : 56 - 68
  • [5] Calculating cumulative inefficiency using earned value management in construction projects
    Lee, Jae-Seob
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2015, 42 (04) : 222 - 232
  • [6] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís PONZ-TIENDA
    Eugenio PELLICER
    Víctor YEPES
    [J]. Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, (01) : 56 - 68
  • [7] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Luis Ponz-Tienda, Jose
    Pellicer, Eugenio
    Yepes, Victor
    [J]. JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2012, 13 (01): : 56 - 68
  • [8] Earned Value Management Software Projects
    Hanna, Robert A.
    [J]. SMC-IT 2009: THIRD IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY, PROCEEDINGS, 2009, : 297 - 304
  • [9] AgileEVM - Earned Value Management in scrum projects
    Sulaiman, Tamara
    Barton, Brent
    Blackburn, Thomas
    [J]. AGILE 2006, Proceedings, 2006, : 7 - 16
  • [10] Assessing the performance of construction projects: Implementing earned value management at the General Services Administration
    Alvarado, Carlos
    Silverman, Robert
    Wilson, David
    [J]. JOURNAL OF FACILITIES MANAGEMENT, 2005, 3 (01) : 92 - +