Monitoring software projects with earned value analysis and use case point

被引:7
|
作者
Li, Jinhua [1 ]
Ma, Zhibing [1 ]
Dong, Huanzhen [1 ]
机构
[1] Qingdao Univ, Coll Informat Engn, Qingdao 266071, Peoples R China
关键词
earned value analysis; use case point; software project; monitor and control;
D O I
10.1109/ICIS.2008.29
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The earned value analysis (EVA) is a project management method for controlling project progress. Two problems cause the difficulty in applying the method on software projects. The first problem is how to consistently express project baselines and to measure technical progress of software projects. The second is due to the conventional Work Breakdown Structure that is prematurely structured around the product cannot reflect the software changes in the development. After discussing the issues and solutions for using EVA on software projects, the paper presents an evolutionary WBS focusing on the elements of software processes, and describes the adoption of use case points as software project baselines and performance measurement. An approach to monitoring software project progress with EVA and use case points is presented A controlled experiment is described which shows the usefulness and effectiveness of the EVA method for tracking and controlling schedule and costs in software projects.
引用
收藏
页码:475 / 480
页数:6
相关论文
共 50 条
  • [1] Tracking Software Development Progress with Earned Value and Use Case Point
    Liu, Guixiang
    PROCEEDINGS OF 2009 INTERNATIONAL WORKSHOP ON INFORMATION SECURITY AND APPLICATION, 2009, : 596 - 600
  • [2] Earned Value Management Software Projects
    Hanna, Robert A.
    SMC-IT 2009: THIRD IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY, PROCEEDINGS, 2009, : 297 - 304
  • [3] The Cost Monitoring of Construction Projects Through Earned Value Analysis
    Khamidi, Mohd Faris
    Khan, Waris Ali
    Idrus, Arazi
    ECONOMICS AND FINANCE RESEARCH, 2011, 4 : 129 - 133
  • [4] Earned value analysis for software project based on function point method
    Lu, Xiangnan
    Bai, Xiaolong
    Wang, Shuyun
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 301 - 308
  • [5] A time-dependent earned value model for software projects
    Warburton, Roger D. H.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (08) : 1082 - 1090
  • [6] Increasing earned value analysis efficiency for IT projects
    Stanek, Stanislaw
    Kuchta, Dorota
    JOURNAL OF DECISION SYSTEMS, 2020, 29 (sup1) : 352 - 360
  • [7] Conditions of success for earned value analysis in projects
    Bryde, David
    Unterhitzenberger, Christine
    Joby, Roger
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (03) : 474 - 484
  • [8] INTEGRATING FUNCTIONAL METRICS, COCOMO II AND EARNED VALUE ANALYSIS FOR SOFTWARE PROJECTS USING PMBoK
    Lombardi Garcia, Carlos Augusto
    Hirata, Celso Massaki
    APPLIED COMPUTING 2008, VOLS 1-3, 2008, : 820 - 825
  • [9] Earned value-based performance monitoring of facility construction projects
    De Marco, Alberto
    Narbaev, Timur
    JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (01) : 69 - +
  • [10] Simplified Earned Value Analysis Method for Highway Construction Projects
    Son, Junghye
    Khwaja, Nabeel
    Milligan, Duane S. S.
    Honey, Brenan D. D.
    TRANSPORTATION RESEARCH RECORD, 2023, 2677 (10) : 301 - 310