Monitoring software projects with earned value analysis and use case point

被引:7
|
作者
Li, Jinhua [1 ]
Ma, Zhibing [1 ]
Dong, Huanzhen [1 ]
机构
[1] Qingdao Univ, Coll Informat Engn, Qingdao 266071, Peoples R China
关键词
earned value analysis; use case point; software project; monitor and control;
D O I
10.1109/ICIS.2008.29
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The earned value analysis (EVA) is a project management method for controlling project progress. Two problems cause the difficulty in applying the method on software projects. The first problem is how to consistently express project baselines and to measure technical progress of software projects. The second is due to the conventional Work Breakdown Structure that is prematurely structured around the product cannot reflect the software changes in the development. After discussing the issues and solutions for using EVA on software projects, the paper presents an evolutionary WBS focusing on the elements of software processes, and describes the adoption of use case points as software project baselines and performance measurement. An approach to monitoring software project progress with EVA and use case points is presented A controlled experiment is described which shows the usefulness and effectiveness of the EVA method for tracking and controlling schedule and costs in software projects.
引用
收藏
页码:475 / 480
页数:6
相关论文
共 50 条
  • [21] Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics
    Tseng, Ching-Chih
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2011, 28 (03) : 165 - 178
  • [22] Regression Modeling for Prediction of Earned Value Indexes in Public Building Construction Projects: The case of Ethiopia
    Ayalew, Genet Melkamu
    Meharie, Meseret Getnet
    Ayalew, Girmay Getawa
    COGENT ENGINEERING, 2023, 10 (01):
  • [23] Research on earned value method for software project tracking
    East China Institute of Computer Technology, Shanghai 200233, China
    Jisuanji Gongcheng, 2006, 15 (70-71+74):
  • [24] Developing fuzzy-based earned value analysis model for estimating the performance of construction projects. A case of selected public building projects in Ethiopia
    Ayalew, Girmay Getawa
    Ayalew, Genet Melkamu
    COGENT ENGINEERING, 2024, 11 (01):
  • [25] An earned-value approach to assess and monitor software project uncertainty: A case study in software test execution
    Zhu X.
    Zhou B.
    Information Technology Journal, 2010, 9 (06) : 1104 - 1114
  • [26] The application, modification & extension of earned value management in construction projects
    Zhang, Xiaoli
    Lin, Zefu
    Ji, Xue
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 955 - 958
  • [27] Earned value method as a tool of controlling complex engineering projects
    Titarenko, Boris
    Titov, Sergey
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2016 - SMART CITY, 2017, 106
  • [28] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [29] PERFORMANCE BASED EARNED VALUE: METHOD AND USE
    Pour, Jan
    IDIMT-2009: SYSTEM AND HUMANS, A COMPLEX RELATIONSHIP, 2009, 29 : 39 - 45
  • [30] Agile software development in an earned value world: a survival guide
    Kantor, Jeffrey
    Long, Kevin
    Becla, Jacek
    FrossieEconomou
    Gelman, Margaret
    Juric, Mario
    Lambert, Ron
    Krughoff, K. Simon
    Swinbank, John D.
    XiuqinWu
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VII, 2016, 9911