Research on earned value method for software project tracking

被引:0
|
作者
East China Institute of Computer Technology, Shanghai 200233, China [1 ]
机构
来源
Jisuanji Gongcheng | 2006年 / 15卷 / 70-71+74期
关键词
D O I
10.1007/s10959-006-0011-8
中图分类号
学科分类号
摘要
The main tracking methods of schedule and cost of software project are explained and compared. The basic principle of the earned value method is systematically described, which includes establishing work breakdown structure, estimating task property and executing project tracking. Finally, the application process of the earned value method is illustrated with an application case. This improves the method effective.
引用
收藏
相关论文
共 50 条
  • [1] Earned value analysis for software project based on function point method
    Lu, Xiangnan
    Bai, Xiaolong
    Wang, Shuyun
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 301 - 308
  • [2] Tracking Software Development Progress with Earned Value and Use Case Point
    Liu, Guixiang
    PROCEEDINGS OF 2009 INTERNATIONAL WORKSHOP ON INFORMATION SECURITY AND APPLICATION, 2009, : 596 - 600
  • [3] Earned value project management of model-centric software development
    Li Jin-hua
    Wei Chang-jiang
    Li Jing
    Li Qiong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12694 - 12697
  • [4] Research on applications of the earned value management in the project cost management
    An, Yuhua
    Liu, Liqun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 973 - 978
  • [5] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [6] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36
  • [7] RESEARCH ON THE EARNED VALUE MANAGEMENT SYSTEM APPLIED IN CONSULTANCY PROJECT PERFORMANCE
    Tserng, H. Ping
    Lin, Wen-Shyong
    Li, Chien-Chung
    Weng, Kai-Wei
    Loisel, Denise C.
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (01): : 21 - 35
  • [8] A Research on the Earned Value Analysis Methodology Based on the Decomposition of the Project Cost
    Qing, Chang
    Bao, Li
    Gedi, Ji
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2008, : 1790 - 1796
  • [9] Earned Value Management Software Projects
    Hanna, Robert A.
    SMC-IT 2009: THIRD IEEE INTERNATIONAL CONFERENCE ON SPACE MISSION CHALLENGES FOR INFORMATION TECHNOLOGY, PROCEEDINGS, 2009, : 297 - 304
  • [10] Tracking Progress through Earned Value
    Erdogmus, Hakan
    IEEE SOFTWARE, 2010, 27 (05) : 2 - 7