Tracking Progress through Earned Value

被引:4
|
作者
Erdogmus, Hakan
机构
[1] Kalemun Research, Canada
关键词
D O I
10.1109/MS.2010.130
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
引用
收藏
页码:2 / 7
页数:6
相关论文
共 50 条
  • [1] Tracking Software Development Progress with Earned Value and Use Case Point
    Liu, Guixiang
    PROCEEDINGS OF 2009 INTERNATIONAL WORKSHOP ON INFORMATION SECURITY AND APPLICATION, 2009, : 596 - 600
  • [2] The Impact of Uncertainty in the Measurement of Progress in Earned Value Analysis
    Almeida, Ricardo
    Abrantes, Rui
    Romao, Mario
    Proenca, Isabel
    INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES 2020 (CENTERIS/PROJMAN/HCIST 2020), 2021, 181 : 457 - 467
  • [3] Research on earned value method for software project tracking
    East China Institute of Computer Technology, Shanghai 200233, China
    Jisuanji Gongcheng, 2006, 15 (70-71+74):
  • [4] Understanding Schedule Progress Using Earned Value and Earned Schedule Techniques at Path-Level
    Capone, Christian
    Narbaev, Timur
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS, PT V, 2021, 634 : 244 - 251
  • [5] Application of Earned Value Method to Progress Control of Construction projects
    Czemplik, Andrzej
    XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 424 - 428
  • [6] Integrating BIM and Earned Value Management System to Measure Construction Progress
    Alzraiee, Hani
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION INFORMATION TECHNOLOGY, 2018, : 684 - 693
  • [7] The Application of Improved Earned Value Model in Engineering Quality and Progress Coordination Management
    Gao, Xukuo
    Ye, Zhiming
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4580 - 4584
  • [8] The Cost Monitoring of Construction Projects Through Earned Value Analysis
    Khamidi, Mohd Faris
    Khan, Waris Ali
    Idrus, Arazi
    ECONOMICS AND FINANCE RESEARCH, 2011, 4 : 129 - 133
  • [9] APPLICATION OF MODIFIED EARNED VALUE METHOD FOR ASSESSING THE RISK AND PROGRESS OF CONSTRUCTION PROJECTS
    Zawistowski, Jacek
    MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 10TH INTERNATIONAL CONFERENCE 2010, VOL I, 2010, : 557 - 560
  • [10] Earned schedule: An emerging enhancement to earned value management
    Lipke, Walt
    Henderson, Kym
    CrossTalk, 2006, 19 (11): : 26 - 30