Research on earned value method for software project tracking

被引:0
|
作者
East China Institute of Computer Technology, Shanghai 200233, China [1 ]
机构
来源
Jisuanji Gongcheng | 2006年 / 15卷 / 70-71+74期
关键词
D O I
10.1007/s10959-006-0011-8
中图分类号
学科分类号
摘要
The main tracking methods of schedule and cost of software project are explained and compared. The basic principle of the earned value method is systematically described, which includes establishing work breakdown structure, estimating task property and executing project tracking. Finally, the application process of the earned value method is illustrated with an application case. This improves the method effective.
引用
收藏
相关论文
共 50 条
  • [41] Latent Errors and Visible Earned Value: How the Evolutionary Model Integrates Earned Value Metrics with Project System Dynamics
    Nevison, John M.
    Chichakly, Karim J.
    SYSTEMS, 2021, 9 (04):
  • [42] Study on project management of railway engineering project base on earned value analysis
    Lizeng, Li
    Tongyin, Han
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 405 - 407
  • [43] Project review in the project management: an investigation study on earned value and balanced scorecard
    Eleyan, Derar
    El-Sawalhi, Nabil
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2010, 13 (06): : 1187 - 1209
  • [44] A time-dependent earned value model for software projects
    Warburton, Roger D. H.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (08) : 1082 - 1090
  • [45] Agile software development in an earned value world: a survival guide
    Kantor, Jeffrey
    Long, Kevin
    Becla, Jacek
    FrossieEconomou
    Gelman, Margaret
    Juric, Mario
    Lambert, Ron
    Krughoff, K. Simon
    Swinbank, John D.
    XiuqinWu
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VII, 2016, 9911
  • [46] MODELING AND SIMULATING THE DYNAMICS IN PROJECT MONITORING AND EARNED VALUE ANALYSIS
    Jigeesh, Nasina
    Bhat, M. S.
    JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2006, 3 (01) : 26 - 43
  • [47] Using earned-value analysis for better project management
    Hayes, HB
    Miller, J
    BIOPHARM-THE APPLIED TECHNOLOGIES OF BIOPHARMACEUTICAL DEVELOPMENT, 2002, 15 (03): : 58 - 59
  • [48] A simulation and evaluation of earned value metrics to forecast the project duration
    Vanhoucke, M.
    Vandevoorde, S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (10) : 1361 - 1374
  • [49] Earned Value Analysis Deployment in an Enterprise Using BI Software
    Silva, M. P.
    Barros, R. M.
    IEEE LATIN AMERICA TRANSACTIONS, 2016, 14 (02) : 907 - 912
  • [50] A Common Tracking Software Project
    Ai X.
    Allaire C.
    Calace N.
    Czirkos A.
    Elsing M.
    Ene I.
    Farkas R.
    Gagnon L.-G.
    Garg R.
    Gessinger P.
    Grasland H.
    Gray H.M.
    Gumpert C.
    Hrdinka J.
    Huth B.
    Kiehn M.
    Klimpel F.
    Kolbinger B.
    Krasznahorkay A.
    Langenberg R.
    Leggett C.
    Mania G.
    Moyse E.
    Niermann J.
    Osborn J.D.
    Rousseau D.
    Salzburger A.
    Schlag B.
    Tompkins L.
    Yamazaki T.
    Yeo B.
    Zhang J.
    Computing and Software for Big Science, 2022, 6 (1)