Monitoring software projects with earned value analysis and use case point

被引:7
|
作者
Li, Jinhua [1 ]
Ma, Zhibing [1 ]
Dong, Huanzhen [1 ]
机构
[1] Qingdao Univ, Coll Informat Engn, Qingdao 266071, Peoples R China
关键词
earned value analysis; use case point; software project; monitor and control;
D O I
10.1109/ICIS.2008.29
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The earned value analysis (EVA) is a project management method for controlling project progress. Two problems cause the difficulty in applying the method on software projects. The first problem is how to consistently express project baselines and to measure technical progress of software projects. The second is due to the conventional Work Breakdown Structure that is prematurely structured around the product cannot reflect the software changes in the development. After discussing the issues and solutions for using EVA on software projects, the paper presents an evolutionary WBS focusing on the elements of software processes, and describes the adoption of use case points as software project baselines and performance measurement. An approach to monitoring software project progress with EVA and use case points is presented A controlled experiment is described which shows the usefulness and effectiveness of the EVA method for tracking and controlling schedule and costs in software projects.
引用
收藏
页码:475 / 480
页数:6
相关论文
共 50 条
  • [41] A Use Case Driven Approach for Quantitative Software Projects Assessment
    Al-Ali, Amani
    Issa, Ayman A.
    2009 SECOND INTERNATIONAL CONFERENCE ON THE APPLICATIONS OF DIGITAL INFORMATION AND WEB TECHNOLOGIES (ICADIWT 2009), 2009, : 808 - +
  • [42] THE USE OF EARNED VALUE MANAGEMENT FOR INITIATING DIRECTIVE PROJECT CONTROL DECISIONS: A CASE STUDY
    Nkiwane, N. H.
    Meyer, W. G.
    Steyn, H.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 27 (01): : 192 - 203
  • [43] Design for Performance Monitoring System Using Earned Value Analysis Method for Nonprofit Organizations Case Study of Organization X, Indonesia
    Gunawan, Arief Samuel
    Fiarni, Cut
    Ryana, Yosephine
    2017 3RD INTERNATIONAL CONFERENCE ON SCIENCE IN INFORMATION TECHNOLOGY (ICSITECH), 2017, : 477 - 482
  • [44] Evaluating the Intention to Use the Use Case Precedence Diagram in Software Development Projects
    Pow-Sang, Jose Antonio
    FUTURE GENERATION INFORMATION TECHNOLOGY, 2010, 6485 : 526 - 537
  • [45] Performance Monitoring of Project Earned Value considering Scope and Quality
    Liu, Guangping
    Jiang, Han
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (01) : 10 - 18
  • [46] Performance Monitoring of Project Earned Value considering Scope and Quality
    Guangping Liu
    Han Jiang
    KSCE Journal of Civil Engineering, 2020, 24 : 10 - 18
  • [47] Use Case Point Estimation Technique in Software Development
    Khatri, Sunil Kumar
    Malhotra, Sanjana
    Johri, Prashant
    2016 5TH INTERNATIONAL CONFERENCE ON RELIABILITY, INFOCOM TECHNOLOGIES AND OPTIMIZATION (TRENDS AND FUTURE DIRECTIONS) (ICRITO), 2016, : 123 - 128
  • [48] Earned value project management of model-centric software development
    Li Jin-hua
    Wei Chang-jiang
    Li Jing
    Li Qiong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12694 - 12697
  • [49] Use of Earned Value Management in the UAE Construction Industry
    Morad, Mohamed
    El-Sayegh, Sameh M.
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [50] Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections
    Proano-Narvaez, Mayra
    Flores-Vazquez, Carlos
    Vasquez Quiroz, Pablo
    Avila-Calle, Marco
    BUILDINGS, 2022, 12 (03)