Performance Monitoring of Project Earned Value considering Scope and Quality

被引:3
|
作者
Liu, Guangping [1 ]
Jiang, Han [1 ]
机构
[1] Hebei Univ Technol, Sch Econ & Management, Tianjin 300401, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scope; Project quality; Earned value management; Performance monitoring; Monitoring process and method; VALUE MANAGEMENT; SCHEDULE;
D O I
10.1007/s12205-020-1054-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
By analyzing the principles of the project earned value management method, we find that the performance monitoring of project earned value encounters the problem of neglecting the impacts of the project's scope and quality on the cost and schedule deviations, which will affect the project earned value performance monitoring. This paper designed a process and method of project earned value performance monitoring considering the scope and quality, and its application is analyzed using a specific case. The results show that the scientific project schedule and cost performance results can be obtained by integrating the scope and quality into the project earned value performance monitoring system while also considering the project's baseline changes based on the activity and critical path perspectives. Finally, the conclusions of this research are summarized and future research directions are given.
引用
收藏
页码:10 / 18
页数:9
相关论文
共 50 条
  • [1] Performance Monitoring of Project Earned Value considering Scope and Quality
    Guangping Liu
    Han Jiang
    [J]. KSCE Journal of Civil Engineering, 2020, 24 : 10 - 18
  • [2] An alternative to earned value reporting on project performance
    Carmichael, David G.
    Balatbat, Maria C. A.
    [J]. PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 602 - 617
  • [3] Earned Scope Management: Scope Performance Evaluation for Software Projects Considering People and Effort as Resources
    Valdes-Souto, Francisco
    [J]. 2019 7TH INTERNATIONAL CONFERENCE IN SOFTWARE ENGINEERING RESEARCH AND INNOVATION (CONISOFT 2019), 2019, : 213 - 222
  • [4] MODELING AND SIMULATING THE DYNAMICS IN PROJECT MONITORING AND EARNED VALUE ANALYSIS
    Jigeesh, Nasina
    Bhat, M. S.
    [J]. JOURNAL OF ADVANCES IN MANAGEMENT RESEARCH, 2006, 3 (01) : 26 - 43
  • [5] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
    Miguel, Angelimarie
    Madria, Wira
    Polancos, Ronaldo
    [J]. 2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
  • [6] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    [J]. Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [7] Earned Scope Management: A Case of Study of Scope Performance using COSMIC (ISO 19761) with a Real Project
    Valdes-Souto, Francisco
    [J]. PROCEEDINGS OF 2016 JOINT CONFERENCE OF THE INTERNATIONAL WORKSHOP ON SOFTWARE MEASUREMENT AND THE INTERNATIONAL CONFERENCE ON SOFTWARE PROCESS AND PRODUCT MEASUREMENT (IWSM-MENSURA), 2016, : 53 - 64
  • [8] A Systematic Review of Earned Value Management Methods for Monitoring and Control of Project Schedule Performance: An AHP Approach
    Mayo-Alvarez, Luis
    Alvarez-Risco, Aldo
    Del-Aguila-Arcentales, Shyla
    Sekar, M. Chandra
    Yanez, Jaime A.
    [J]. SUSTAINABILITY, 2022, 14 (22)
  • [9] Novel Quality-Embedded Earned Value Performance Analysis Tool for Sustainable Project Portfolio Production
    Wang, Chen
    Tang, Yutong
    Kassem, Mukhtar A.
    Ong, Hong Yeow
    Yap, Jeffrey Boon Hui
    Ali, Kherun Nita
    [J]. SUSTAINABILITY, 2022, 14 (13)
  • [10] RESEARCH ON THE EARNED VALUE MANAGEMENT SYSTEM APPLIED IN CONSULTANCY PROJECT PERFORMANCE
    Tserng, H. Ping
    Lin, Wen-Shyong
    Li, Chien-Chung
    Weng, Kai-Wei
    Loisel, Denise C.
    [J]. JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (01): : 21 - 35