Preventive maintenance scheduling of a multi-skilled human resource-constrained project's portfolio

被引:17
|
作者
Bocewicz, G. [1 ]
Golinska-Dawson, P. [2 ]
Szwarc, E. [1 ]
Banaszak, Z. [1 ]
机构
[1] Koszalin Univ Technol, Fac Elect & Comp Sci, Koszalin, Poland
[2] Poznan Univ Tech, Fac Engn Management, Poznan, Poland
关键词
Multi-skilled human resource; Human resource maintenance; Project portfolio; Multi-items lot-sizing problem; Remanufacturing; LEARNING-CURVE THEORY; STAFF ASSIGNMENT; PERFORMANCE-MODEL; JOB ROTATION; IMPACT; MANAGEMENT; ALLOCATION; SYSTEM; OPTIMIZATION; PERSONNEL;
D O I
10.1016/j.engappai.2022.105725
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Companies often struggle with the problem of appropriately assigning multi-skilled employees and maintaining the required skill levels while performing a changing project's portfolio. The paper focuses on maintaining employee skills at a constant level without degradation. Maintaining the required team efficiency and competency levels through staff rotation while avoiding additional periodic training because of competency loss has been considered. The aim is to develop an analytical tool that considers individual learning and workers who irregularly perform repetitive tasks and forget their skills. Incorporating competency's learning and forgetting curves into modelling workers' assignments and schedules allows for more accurate estimates of actual and future workforce performance. The paper contributes to the theory by proposing a novel declarative programming approach which allows for rotating a multi-skilled team of employees to maintain their competences at a required level. The stationary declarative model that implements this approach can easily be extended to non-stationary and fuzzy variants. The decision-making problem is looking for the rotation schedule of a multi-skilled team of employees to maintain their competences at a required level when satisfying the timely fulfilment of a given project's portfolio. The presented case study from remanufacturing industry illustrates that the proposed approach can be used for the scale of problems which occur in real-life companies.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Resource-constrained project scheduling - Minimization of project duration
    不详
    PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174
  • [32] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [33] Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches
    Javanmard, Shima
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 96 : 55 - 68
  • [34] GENETIC ALGORITHMS FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM IN AIRCRAFT HEAVY MAINTENANCE
    Pimapunsri, Kusol
    Weeranant, Darawan
    Riel, Andreas
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 28 (06):
  • [35] Modeling for Project Scheduling with Multi-skilled Workforce Constraints and Uncertainty
    Chen Di
    Liu Shi-xin
    Wang Yi-fan
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 157 - 160
  • [36] Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    Joanna Józefowska
    Marek Mika
    Rafał Różycki
    Grzegorz Waligóra
    Jan Węglarz
    Annals of Operations Research, 2001, 102 : 137 - 155
  • [37] Resource-constrained project scheduling: a heuristic for the multi-mode case
    Heilmann, R
    OR SPEKTRUM, 2001, 23 (03) : 335 - 357
  • [38] Modelling and Solving Multi-mode Resource-Constrained Project Scheduling
    Szeredi, Ria
    Schutt, Andreas
    PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2016, 2016, 9892 : 483 - 492
  • [39] Resource-constrained multi-project scheduling with activity and time flexibility
    Hauder, Viktoria A.
    Beham, Andreas
    Raggl, Sebastian
    Parragh, Sophie N.
    Affenzeller, Michael
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 150
  • [40] Simulated annealing for multi-mode resource-constrained project scheduling
    Józefowska, J
    Mika, M
    Rózycki, R
    Waligóra, G
    Weglarz, J
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 137 - 155