Preventive maintenance scheduling of a multi-skilled human resource-constrained project's portfolio

被引:17
|
作者
Bocewicz, G. [1 ]
Golinska-Dawson, P. [2 ]
Szwarc, E. [1 ]
Banaszak, Z. [1 ]
机构
[1] Koszalin Univ Technol, Fac Elect & Comp Sci, Koszalin, Poland
[2] Poznan Univ Tech, Fac Engn Management, Poznan, Poland
关键词
Multi-skilled human resource; Human resource maintenance; Project portfolio; Multi-items lot-sizing problem; Remanufacturing; LEARNING-CURVE THEORY; STAFF ASSIGNMENT; PERFORMANCE-MODEL; JOB ROTATION; IMPACT; MANAGEMENT; ALLOCATION; SYSTEM; OPTIMIZATION; PERSONNEL;
D O I
10.1016/j.engappai.2022.105725
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Companies often struggle with the problem of appropriately assigning multi-skilled employees and maintaining the required skill levels while performing a changing project's portfolio. The paper focuses on maintaining employee skills at a constant level without degradation. Maintaining the required team efficiency and competency levels through staff rotation while avoiding additional periodic training because of competency loss has been considered. The aim is to develop an analytical tool that considers individual learning and workers who irregularly perform repetitive tasks and forget their skills. Incorporating competency's learning and forgetting curves into modelling workers' assignments and schedules allows for more accurate estimates of actual and future workforce performance. The paper contributes to the theory by proposing a novel declarative programming approach which allows for rotating a multi-skilled team of employees to maintain their competences at a required level. The stationary declarative model that implements this approach can easily be extended to non-stationary and fuzzy variants. The decision-making problem is looking for the rotation schedule of a multi-skilled team of employees to maintain their competences at a required level when satisfying the timely fulfilment of a given project's portfolio. The presented case study from remanufacturing industry illustrates that the proposed approach can be used for the scale of problems which occur in real-life companies.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [42] Resource-constrained project scheduling problem with multi-factor disruptions
    College of Computer Science and Information Engineering, Zhejiang Gongshang University, Hangzhou 310018, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 2012, 11 (2409-2418):
  • [43] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [44] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [45] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [46] An Extended CPM for Resource-constrained Project Scheduling
    Ju, C. H.
    Xie, Y.
    ULTRA-PRECISION MACHINING TECHNOLOGIES, 2009, 69-70 : 695 - 699
  • [47] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [48] RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART
    HERROELEN, WS
    OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) : 261 - +
  • [49] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [50] Influence of learning in resource-constrained project scheduling
    Van Peteghem, Vincent
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 569 - 579