NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING

被引:91
|
作者
DREXL, A [1 ]
GRUENEWALD, J [1 ]
机构
[1] TH DARMSTADT,INST BETRIEBSWIRTSCHAFTSLEHRE,W-6100 DARMSTADT,GERMANY
关键词
D O I
10.1080/07408179308964317
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses methods for formulating and solving a general class of nonpreemptive resource-constrained project scheduling problems in which job durations are discrete functions of committed renewable, nonrenewable and doubly-constrained resources (multi-mode time resource tradeoff). We present a stochastic scheduling method which solves these problems to suboptimality in an efficient way. Computational results demonstrate that this method is highly superior to other well-known existing deterministic scheduling rules. Extensions to problems in which job-specific (demand) resource profiles are varying with time, in addition to time-varying supply resource profiles, are discussed as well.
引用
收藏
页码:74 / 81
页数:8
相关论文
共 50 条
  • [1] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [2] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    [J]. Journal of Global Optimization, 2020, 76 : 211 - 241
  • [3] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    [J]. IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [4] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [6] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Menesi, Wail
    Hegazy, Tarek
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [7] An organizational cooperative coevolutionary algorithm for multimode resource-constrained project scheduling problems
    Wang, Lixia
    Liu, Jing
    Zhou, Mingxing
    [J]. Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 2014, 8886 : 680 - 690
  • [8] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [9] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Chu, Zihao
    Xu, Zhe
    Xie, Fang
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44 (03) : 2503 - 2517
  • [10] An Organizational Cooperative Coevolutionary Algorithm for Multimode Resource-Constrained Project Scheduling Problems
    Wang, Lixia
    Liu, Jing
    Zhou, Mingxing
    [J]. SIMULATED EVOLUTION AND LEARNING (SEAL 2014), 2014, 8886 : 680 - 690