Preventive maintenance scheduling of a multi-skilled human resource-constrained project's portfolio

被引:17
|
作者
Bocewicz, G. [1 ]
Golinska-Dawson, P. [2 ]
Szwarc, E. [1 ]
Banaszak, Z. [1 ]
机构
[1] Koszalin Univ Technol, Fac Elect & Comp Sci, Koszalin, Poland
[2] Poznan Univ Tech, Fac Engn Management, Poznan, Poland
关键词
Multi-skilled human resource; Human resource maintenance; Project portfolio; Multi-items lot-sizing problem; Remanufacturing; LEARNING-CURVE THEORY; STAFF ASSIGNMENT; PERFORMANCE-MODEL; JOB ROTATION; IMPACT; MANAGEMENT; ALLOCATION; SYSTEM; OPTIMIZATION; PERSONNEL;
D O I
10.1016/j.engappai.2022.105725
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Companies often struggle with the problem of appropriately assigning multi-skilled employees and maintaining the required skill levels while performing a changing project's portfolio. The paper focuses on maintaining employee skills at a constant level without degradation. Maintaining the required team efficiency and competency levels through staff rotation while avoiding additional periodic training because of competency loss has been considered. The aim is to develop an analytical tool that considers individual learning and workers who irregularly perform repetitive tasks and forget their skills. Incorporating competency's learning and forgetting curves into modelling workers' assignments and schedules allows for more accurate estimates of actual and future workforce performance. The paper contributes to the theory by proposing a novel declarative programming approach which allows for rotating a multi-skilled team of employees to maintain their competences at a required level. The stationary declarative model that implements this approach can easily be extended to non-stationary and fuzzy variants. The decision-making problem is looking for the rotation schedule of a multi-skilled team of employees to maintain their competences at a required level when satisfying the timely fulfilment of a given project's portfolio. The presented case study from remanufacturing industry illustrates that the proposed approach can be used for the scale of problems which occur in real-life companies.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Augmented heuristic algorithm for multi-skilled resource scheduling
    Wongwai, Narongrit
    Malaikrisanachalee, Suphawut
    AUTOMATION IN CONSTRUCTION, 2011, 20 (04) : 429 - 445
  • [22] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [23] A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem
    Shou, Yongyi
    Xiang, Wenwen
    Li, Ying
    Yao, Weijian
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [24] A Conceptual Framework for Project Scheduling with Multi-skilled Resources
    Zammori, Francesco
    Bertolini, Massimo
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRIAL ENGINEERING (AIIE 2015), 2015, 123 : 375 - 378
  • [25] Optimizing linear project scheduling with multi-skilled crews
    Liu, Shu-Shun
    Wang, Chang-Jung
    AUTOMATION IN CONSTRUCTION, 2012, 24 : 16 - 23
  • [26] A Risk Minimization Model for a Multi-Skilled, Multi-Mode Resource-Constrained Project Scheduling Problem with Discrete Time-Cost-Quality-Risk Trade-Off
    Polancos, Ronaldo V.
    Seva, Rosemary R.
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (03) : 272 - 288
  • [27] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Van Eynde, Rob
    Vanhoucke, Mario
    JOURNAL OF SCHEDULING, 2020, 23 (03) : 301 - 325
  • [28] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Rob Van Eynde
    Mario Vanhoucke
    Journal of Scheduling, 2020, 23 : 301 - 325
  • [29] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [30] Resource-constrained formulation for production scheduling and maintenance
    Aguirre, Adrian M.
    Papageorgiou, Lazaros G.
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1375 - 1380