Resource-constrained multi-project scheduling with activity and time flexibility

被引:26
|
作者
Hauder, Viktoria A. [1 ,2 ,3 ]
Beham, Andreas [1 ,3 ]
Raggl, Sebastian [1 ,3 ]
Parragh, Sophie N. [2 ]
Affenzeller, Michael [3 ,4 ]
机构
[1] Univ Appl Sci Upper Austria, Josef Ressel Ctr Adapt Optimizat Dynam Environm, Hagenberg, Austria
[2] Johannes Kepler Univ Linz, Inst Prod & Logist Management, Linz, Austria
[3] Univ Appl Sci Upper Austria, Heurist & Evolutionary Algorithms Lab, Hagenberg, Austria
[4] Johannes Kepler Univ Linz, Inst Formal Models & Verificat, Linz, Austria
关键词
Multi-project scheduling; Activity and time flexibility; Constraint programming; Manufacturing; INTEGER; FORMULATIONS; SEARCH; MODELS;
D O I
10.1016/j.cie.2020.106857
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many production planning applications. To meet these requirements, a new resource-constrained project scheduling problem (RCPSP) is introduced where both decisions (activity flexibility and time flexibility) are integrated. Besides the minimization of makespan, two new alternative objectives are presented: maximization of balanced length of selected activities (time balance) and maximization of balanced resource utilization (resource balance). New mixed integer and constraint programming (CP) models are proposed for the developed integrated flexible project scheduling problem. Benchmark instances on an already existing flexible RCPSP and the newly developed problem are solved to optimality. The real-world applicability of the suggested CP models is shown by additionally solving a large industry case.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [2] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [3] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Van Eynde, Rob
    Vanhoucke, Mario
    [J]. JOURNAL OF SCHEDULING, 2020, 23 (03) : 301 - 325
  • [4] Multimode Resource-Constrained Multi-Project Scheduling with Ad Hoc Activity Splitting
    Joo, B. J.
    Chua, P. C.
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2261 - 2265
  • [5] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Rob Van Eynde
    Mario Vanhoucke
    [J]. Journal of Scheduling, 2020, 23 : 301 - 325
  • [6] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [7] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Afruzi, E. Nabipoor
    Aghaie, A.
    Najafi, A. A.
    [J]. SCIENTIA IRANICA, 2020, 27 (01) : 361 - 376
  • [8] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi E.
    Aghaie A.
    Najafi A.A.
    [J]. Scientia Iranica, 2020, 27 (1 E) : 361 - 376
  • [9] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [10] Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
    Peng, Wuliang
    Yu, Dongmin
    Lin, Jiali
    [J]. IEEE ACCESS, 2023, 11 : 64370 - 64382