Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [31] Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time
    Liu, Runze
    Jia, Qi
    Yu, Hui
    Gao, Kaizhou
    Fu, Yaping
    Yin, Li
    MATHEMATICS, 2025, 13 (03)
  • [32] A hybrid TP plus PLS algorithm for bi-objective flow-shop scheduling problems
    Dubois-Lacoste, Jeremie
    Lopez-Ibanez, Manuel
    Stutzle, Thomas
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (08) : 1219 - 1236
  • [33] Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop
    Liu, Ming
    Yang, Xuenan
    IFAC PAPERSONLINE, 2019, 52 (13): : 2128 - 2133
  • [34] A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 560 - 566
  • [35] Bi-Objective Optimization of a Flow Shop Scheduling Problem Under Time-of-Use Tariffs
    Wang, Xinyue
    Chu, Feng
    Ren, Tao
    Bai, Danyu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [36] A two-stage assignment strategy for the robust scheduling of dual-resource constrained stochastic job shop scheduling problems
    Xiao, Shichang
    Wu, Zigao
    Yu, Shaohua
    IFAC PAPERSONLINE, 2019, 52 (13): : 421 - 426
  • [37] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Dong Jian-ming
    Hu Jue-liang
    Chen Yong
    APPLIED MATHEMATICS-A JOURNAL OF CHINESE UNIVERSITIES SERIES B, 2013, 28 (03) : 358 - 368
  • [38] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    Jian-ming Dong
    Jue-liang Hu
    Yong Chen
    Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368
  • [39] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
    DONG Jianming
    HU Jueliang
    CHEN Yong
    Applied Mathematics:A Journal of Chinese Universities(Series B), 2013, 28 (03) : 358 - 368
  • [40] State-Variable Modeling for a Class of Two-Stage Stochastic Optimization Problems
    Doulabi, Hossein Hashemi
    Ahmed, Shabbir
    Nemhauser, George
    INFORMS JOURNAL ON COMPUTING, 2022, 34 (01) : 354 - 369