共 50 条
- [2] Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage [J]. Applied Mathematics-A Journal of Chinese Universities, 2013, 28 : 358 - 368
- [3] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan [J]. INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
- [6] Distributed two-stage hybrid flow shop scheduling [J]. Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
- [8] Optimal Scheduling of a Two-stage Hybrid Flow Shop [J]. Mathematical Methods of Operations Research, 2006, 64 : 107 - 124