Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [41] Scheduling deferrable electric appliances in smart homes: a bi-objective stochastic optimization approach
    Rossit, Diego G.
    Nesmachnow, Segio
    Toutouh, Jamal
    Luna, Francisco
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2022, 19 (01) : 34 - 65
  • [42] A Fuzzy Multi-Objective Tabu-Search Method for a New Bi-Objective Open Shop Scheduling Problem
    Seraj, O.
    Tavakkoli-Moghaddam, R.
    Jolai, F.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 164 - 169
  • [43] The Similarity Index to Decompose Two-Stage Stochastic Scheduling Problems
    Montes, Daniel
    Pitarch, Jose Luis
    de Prada, Cesar
    IFAC PAPERSONLINE, 2022, 55 (07): : 821 - 826
  • [44] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [45] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [46] Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [47] Gravitational Search Algorithm Optimization for Bi-Objective Flow Shop Scheduling using Weighted Dispatching Rules
    Lee, T. S.
    Loong, Y. T.
    Moslemipour, G.
    2017 7TH IEEE INTERNATIONAL CONFERENCE ON CONTROL SYSTEM, COMPUTING AND ENGINEERING (ICCSCE), 2017, : 127 - 132
  • [48] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan
    Ren, Tao
    Liu, Bingqian
    Zhao, Peng
    Yuan, Huawei
    Li, Haiyan
    Bai, Danyu
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
  • [49] Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments
    Dong, Jianming
    Chang, Joshua
    Su, Bing
    Hu, Jueliang
    Lin, Guohui
    JOURNAL OF SCHEDULING, 2020, 23 (05) : 595 - 608
  • [50] Two-stage stochastic optimization problems with stochastic ordering constraints on the recourse
    Dentcheva, Darinka
    Martinez, Gabriela
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 219 (01) : 1 - 8