Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [21] Bi-objective Optimization of Multiple-route Job Shop Scheduling with Route Cost
    Zheng, Feifeng
    Sui, Yang
    IFAC PAPERSONLINE, 2019, 52 (13): : 881 - 886
  • [22] Two bi-objective optimization models for competitive location problems
    Hua, Guo-Wei
    Yang, Feng-Mei
    Lai, Kin Keung
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (01): : 99 - 106
  • [23] Two bi-objective optimization models for competitive location problems
    Yang, Fengmei
    Hua, Guowei
    Inoue, Hiroshi
    Shi, Jianming
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2006, 5 (03) : 531 - 543
  • [24] Two-stage bio-inspired optimization algorithm for stochastic job shop scheduling problem
    Department of Computer Science and Information Engineering, Chaoyang University of Technology, Taichung, Taiwan
    不详
    Int. J. Simul. Syst. Sci. Technol., 4 (8.1-8.8):
  • [25] A Two-Stage Solution to the Bi-Objective Optimal Voltage Regulation Problem
    Kryonidis, Georgios C.
    Demoulias, Charis S.
    Papagiannis, Grigoris K.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (02) : 928 - 937
  • [26] A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem
    Zhang, Rui
    Song, Shiji
    Wu, Cheng
    KNOWLEDGE-BASED SYSTEMS, 2012, 27 : 393 - 406
  • [27] A bi-objective coordination setup problem in a two-stage production system
    Ciavotta, Michele
    Detti, Paolo
    Meloni, Carlo
    Pranzo, Marco
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 734 - 745
  • [28] Modeling and solution for hybrid flow-shop scheduling problem by two-stage stochastic programming
    Huang, Yiping
    Deng, Libao
    Wang, Jianlei
    Qiu, Weiwei
    Liu, Jinfeng
    EXPERT SYSTEMS WITH APPLICATIONS, 2023, 233
  • [29] Solving Bi-Objective Stage Shop Scheduling Problem by Flower Pollination Algorithm with Fuzzy Orientation
    Bandyopadhyay, Susmita
    Mandal, Indraneel
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON INVENTIVE COMPUTATION TECHNOLOGIES (ICICT-2020), 2020, : 767 - 772
  • [30] A Two-Stage ε-Constraint Strategy-Based Heuristic for Bi-Objective Quadratic Multiple Knapsack Problems
    Aider, Meziane
    Gacem, Oussama
    Hifi, Mhand
    2020 7TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING & MACHINE INTELLIGENCE (ISCMI 2020), 2020, : 51 - 55