Construction and commissioning of the first wiggler at BEPC

被引:0
|
作者
Jiyang, Zeng
Caitu, Shi
Jian, Sun
Renhuai, Chen
Maosan, Liu
Shaoxing, Chen
机构
关键词
D O I
10.1016/0168-9002(91)90075-2
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Construction and adjustment of a wiggler for Storage ring FEL
    Liu, B
    Ma, YW
    Lu, YZ
    Zhang, ZM
    Zhang, FM
    Zhang, LJ
    Chui, ZW
    Hu, JQ
    Pu, DX
    FREE ELECTRON LASERS 1998, 1999, : II67 - II68
  • [42] STRATEGY FOR THE FIRST TWO MONTHS OF LHC BEAM COMMISSIONING (COMMISSIONING TO FIRST STABLE BEAMS)
    Redaelli, S.
    Arduini, G.
    Giovannozzi, M.
    Lamont, M.
    Tomas, R.
    Wenninger, J.
    CHAMONIX 2014: WORKSHOP ON LHC PERFORMANCE, 2015, : 125 - 128
  • [43] Commissioning MATISSE: first results
    Petrov, Romain G.
    Allouche, Fatme
    Berio, Philippe
    Chelli, Alain
    Cruzalebes, Pierre
    Fantei, Yan
    Jaffe, Walter
    Glindemann, Andreas
    Lagarde, Stephane
    Lopez, Bruno
    Matter, Alexis
    Meilland, Antony
    Millour, Florentin
    Morel, Sebastien
    Paladini, Claudia
    Rivinius, Thomas
    Robbe-Dubois, Sylvie
    Rousseau, Sylvain
    Schoeller, Markus
    Varga, Jozsef
    Zins, Gerard
    OPTICAL AND INFRARED INTERFEROMETRY AND IMAGING VI, 2018, 10701
  • [44] Construction and tuning of BEPC mini-β permanent quadrupole prototype
    Peng, Q.L.
    Yin, Z.S.
    Yang, Y.
    Shi, C.T.
    Sun, J.
    Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 1998, 406 (01): : 53 - 57
  • [45] GP commissioning: the first year
    Charlton, Rodger
    CLINICAL MEDICINE, 2014, 14 (03) : 221 - 222
  • [46] Construction and Commissioning of the Magnets for the OPERA Experiment
    Falcone, R. Adinolfi
    Bergnoli, A.
    Cazes, A.
    Cecchetti, A.
    Dulach, B.
    Fanin, C.
    Fulgenzi, A.
    Garfagnini, A.
    Grianti, F.
    Incurvati, M.
    Mengucci, A.
    Orecchini, D.
    Peiro, G.
    Pellegrino, L.
    Sanelli, C.
    Spinetti, M.
    Terranova, F.
    Ventura, M.
    Votano, L.
    2006 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD, VOL 1-6, 2006, : 447 - 450
  • [47] Construction and commissioning of the Berezniki chemical plant
    Vladimir, Shilov V.
    VOPROSY ISTORII, 2022, 6 (02) : 94 - 106
  • [48] HHV FACILITY - EXPERIENCE IN CONSTRUCTION AND COMMISSIONING
    HEBEL, G
    WEISKOPF, H
    TERKESSIDIS, J
    HOFMANN, W
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1982, 27 (05): : 258 - 262
  • [49] Design, construction, and commissioning of top gun
    Aguirre, CE
    Reichman, SH
    Grosse, IA
    PROCEEDINGS OF THE CONFERENCE ON ELECTRON BEAM MELTING AND REFINING - STATE OF THE ART 1998, 1998, : 41 - 45