The 2015 LHC schedule tentatively allocates two months between the start of beam commissioning and the establishment of the first stable beams with a few nominal bunches at top energy. This phase will address the commissioning with beam of all key accelerator systems, taking into account the changes occurred in Long Shutodown 1 (LS1) and new commissioning requirements for the 2015 operational goals. In presence of uncertainties on the key machine and beam parameters, a set of critical measurements to be performed early on in the commissioning are identified in order to establish a validation plan for the machine configuration for the intensity ramp up. In this paper, the strategy for the initial commissioning until the first stable beams is reviewed.
引用
收藏
页码:125 / 128
页数:4
相关论文
共 50 条
  • [1] Commissioning of the ATLAS detector with cosmic rays and first LHC beams
    Costa, M. J.
    DISCRETE 08: SYMPOSIUM ON PROSPECTS IN THE PHYSICS OF DISCRETE SYMMETRIES, 2009, 171
  • [2] The Commissioning of the CMS ECAL Detector with Cosmics and First LHC Beams
    Thea, Alessandro
    2009 16TH IEEE-NPSS REAL TIME CONFERENCE, 2009, : 559 - 564
  • [3] The CMS High Level Trigger: Commissioning and First Operation with LHC Beams
    Felcini, M.
    Zanetti, M.
    2008 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE (2008 NSS/MIC), VOLS 1-9, 2009, : 1139 - +
  • [4] The LHC beam commissioning
    Redaelli, S.
    Bailey, R.
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA B-GENERAL PHYSICS RELATIVITY ASTRONOMY AND MATHEMATICAL PHYSICS AND METHODS, 2008, 123 (3-4): : 279 - 288
  • [5] Commissioning the cryogenic system of the first LHC sector
    Millet, F.
    Claudet, S.
    Ferlin, G.
    Perin, A.
    Rabehl, R.
    Riddone, G.
    Ronayette, L.
    Serio, L.
    Soubiran, M.
    Tavian, L.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 1403 - +
  • [6] The Atlas Liquid Argon Calorimeter: Commissioning with Cosmic Muons and First LHC Beams
    Trocme, B.
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2009, 197 : 139 - 142
  • [7] Beam commissioning in the first superconducting segment of the Facility for Rare Isotope Beams
    Ostroumov, P. N.
    Maruta, T.
    Cogan, S.
    Fukushima, K.
    Kim, S. H.
    Lidia, S.
    Marti, F.
    Plastun, A. S.
    Wei, J.
    Yoshimoto, T.
    Zhang, T.
    Zhao, Q.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2019, 22 (08):
  • [8] Calibration, testing, commissioning and first data of ALFA at LHC
    Jakobsen, Sune
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2012, 695 : 342 - 346
  • [9] LHCb vertex locator commissioning and results from the first LHC beam reconstructed tracks
    Borghi, Silvia
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (01): : 156 - 158
  • [10] ATLAS Tile Calorimeter Data Preparation for LHC first beam data taking and commissioning data
    Fiorini, Luca
    17TH INTERNATIONAL CONFERENCE ON COMPUTING IN HIGH ENERGY AND NUCLEAR PHYSICS (CHEP09), 2010, 219