The 2015 LHC schedule tentatively allocates two months between the start of beam commissioning and the establishment of the first stable beams with a few nominal bunches at top energy. This phase will address the commissioning with beam of all key accelerator systems, taking into account the changes occurred in Long Shutodown 1 (LS1) and new commissioning requirements for the 2015 operational goals. In presence of uncertainties on the key machine and beam parameters, a set of critical measurements to be performed early on in the commissioning are identified in order to establish a validation plan for the machine configuration for the intensity ramp up. In this paper, the strategy for the initial commissioning until the first stable beams is reviewed.
引用
收藏
页码:125 / 128
页数:4
相关论文
共 50 条
  • [31] Commissioning of the ATLAS Muon Trigger with Beam Collisions at the LHC
    Oh, Alexander
    2010 IEEE NUCLEAR SCIENCE SYMPOSIUM CONFERENCE RECORD (NSS/MIC), 2010, : 617 - 623
  • [32] First commissioning results of the Apollon laser on the 1 PW beam line
    Papadopoulos, D. N.
    Zou, J. P.
    Le Blanc, C.
    Ranc, L.
    Druon, F.
    Martin, L.
    Freneaux, A.
    Beluze, A.
    Lebas, N.
    Chabanis, M.
    Bonnin, C.
    Accary, J. B.
    Garrec, B. L.
    Mathieu, F.
    Audebert, P.
    2019 CONFERENCE ON LASERS AND ELECTRO-OPTICS (CLEO), 2019,
  • [33] mTOF performance during the first main commissioning beam time at mCBM
    Zhang, Q.
    Deppner, I
    Herrmann, N.
    Wang, Y.
    JOURNAL OF INSTRUMENTATION, 2020, 15 (12):
  • [34] Beam commissioning of the first clinical biology-guided radiotherapy system
    Han, Bin
    Capaldi, Dante
    Kovalchuk, Nataliya
    Simiele, Eric
    White, John
    Zaks, Daniel
    Xing, Lei
    Surucu, Murat
    JOURNAL OF APPLIED CLINICAL MEDICAL PHYSICS, 2022, 23 (06):
  • [35] Commissioning and performance of the ATLAS Inner Detector with the first beam and cosmic data
    Andreazza, A.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 1 - 4
  • [36] Commissioning and first operation of the pCVD diamond ATLAS beam conditions monitor
    Dobos, D.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (01): : 405 - 407
  • [37] Commissioning the Muon Campus external beamline: first beam optics measurement
    Loe, Trevor
    Stratakis, Diktys
    JOURNAL OF INSTRUMENTATION, 2023, 18 (04)
  • [38] COMMISSIONING OF FIRST 500 MW SET
    GILES, LT
    ELECTRICAL REVIEW, 1969, 184 (19): : 684 - &
  • [39] Commissioning of the first insertion devices at SOLEIL
    Benabderrahmane, C.
    Berteaud, P.
    Briquez, F.
    Brunelle, P.
    Chubar, O.
    Couprie, M. -E.
    Filhol, J. -M.
    Girault, M.
    Marcouille, O.
    Marteau, F.
    Massal, M.
    Paulin, F.
    Valleau, M.
    Veteran, J.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 3128 - 3130
  • [40] First commissioning of the SuperKEKB vacuum system
    Suetsugu, Y.
    Shibata, K.
    Ishibashi, T.
    Kanazawa, K.
    Shirai, M.
    Terui, S.
    Hisamatsu, H.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2016, 19 (12):