Construction and commissioning of the first wiggler at BEPC

被引:0
|
作者
Jiyang, Zeng
Caitu, Shi
Jian, Sun
Renhuai, Chen
Maosan, Liu
Shaoxing, Chen
机构
关键词
D O I
10.1016/0168-9002(91)90075-2
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage
    秦庆
    黄楠
    刘渭滨
    刘瑜冬
    彭月梅
    邱静
    王逗
    王昕昊
    王娜
    王九庆
    魏源源
    温雪梅
    邢军
    徐刚
    于程辉
    张闯
    张源
    赵政
    周德民
    中国物理C, 2009, (S2) : 65 - 70
  • [22] Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage
    秦庆
    黄楠
    刘渭滨
    刘瑜冬
    彭月梅
    邱静
    王逗
    王昕昊
    王娜
    王九庆
    魏源源
    温雪梅
    邢军
    徐刚
    于程辉
    张闯
    张源
    赵政
    周德民
    Chinese Physics C, 2009, 33 (S2) : 65 - 70
  • [23] Construction, Commissioning and First Data from the CRIPT Muon Tomography Project
    Anghel, V.
    Armitage, J.
    Botte, J.
    Boudjemline, K.
    Bryman, D.
    Bueno, J.
    Charles, E.
    Cousins, T.
    Erlandson, A.
    Gallant, G.
    Gazit, R.
    Golovko, V. V.
    Hydomako, R.
    Jewett, C.
    Jonkmans, G.
    Liu, Z.
    Magill, M.
    Noel, S.
    Oakham, G.
    Robichaud, A.
    Stocki, T. J.
    Thompson, M.
    Waller, D.
    2012 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE RECORD (NSS/MIC), 2012, : 738 - 742
  • [24] Construction, commissioning and first results of the Spanish Stellarator TJ-II
    Blaumoser, M
    Alejaldre, C
    Almoguera, L
    Alonso, J
    Ascasibar, E
    Botija, J
    Carrasco, R
    Doncel, J
    Fraguas, A
    Garcia, A
    Kirpitchev, I
    Knaster, J
    Martinez, A
    Medrano, M
    Mendez, P
    Pacios, L
    de la Pena, A
    Qin, J
    Sanchez, J
    Tabares, F
    17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 257 - 260
  • [25] Commissioning and operation of the cryostat for 3W1 SC wiggler
    Miao?Fu Xu
    Xiang?Zhen Zhang
    Rui Ye
    Jin?Can Wang
    Xiao?Juan Bian
    Yao Gao
    Min?Xian Li
    Fu?San Chen
    Xiao?Chen Yang
    Rui Ge
    Nuclear Science and Techniques, 2023, 34 (06) : 190 - 201
  • [26] Beam dynamics studies on BEPC-II storage rings at the commissioning stage
    Qin Qing
    Huang Nan
    Liu Wei-Bin
    Liu Yu-Dong
    Peng Yue-Mei
    Qiu Jing
    Wang Dou
    Wang Xin-Hao
    Wang Na
    Wang Jiu-Qing
    Wei Yuan-Yuan
    Wen Xue-Mei
    Xing Jun
    Xu Gang
    Yu Cheng-Hui
    Zhang Chuang
    Zhang Yuan
    Zhao Zheng
    Zhou De-Min
    CHINESE PHYSICS C, 2009, 33 : 65 - 70
  • [27] Commissioning and operation of the cryostat for 3W1 SC wiggler
    Miao-Fu Xu
    Xiang-Zhen Zhang
    Rui Ye
    Jin-Can Wang
    Xiao-Juan Bian
    Yao Gao
    Min-Xian Li
    Fu-San Chen
    Xiao-Chen Yang
    Rui Ge
    Nuclear Science and Techniques, 2023, 34
  • [28] Ethics in commissioning in construction
    Lohne, Jardad
    Shirkavand, Iman
    Firing, Martine
    Schneider, Kim
    Laedre, Ola
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 256 - 263
  • [29] Construction of the phasing system for BEPC II linac
    Hou Mi
    Geng Zhe-Qiao
    HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION, 2007, 31 (04): : 391 - 394
  • [30] Commissioning and operation of the cryostat for 3W1 SC wiggler
    Xu, Miao-Fu
    Zhang, Xiang-Zhen
    Ye, Rui
    Wang, Jin-Can
    Bian, Xiao-Juan
    Gao, Yao
    Li, Min-Xian
    Chen, Fu-San
    Yang, Xiao-Chen
    Ge, Rui
    NUCLEAR SCIENCE AND TECHNIQUES, 2023, 34 (06)