共 50 条
- [31] Construction and performance of a superconducting multipole Wiggler SYNCHROTRON RADIATION INSTRUMENTATION, 2004, 705 : 199 - 202
- [32] Design, construction, and first commissioning results of superconducting source for ions at NSCL/MSU REVIEW OF SCIENTIFIC INSTRUMENTS, 2008, 79 (02):
- [33] Construction, commissioning, and cryogenic performances of the first TESLA test facility (TTF) cryomodule ADVANCES IN CRYOGENIC ENGINEERING, VOL 43 PTS A AND B, 1998, 43 : 87 - 96
- [35] Detector construction, QC and commissioning INNOVATIVE DETECTORS FOR SUPERCOLLIDERS, 2004, 25 : 15 - 30
- [37] LHC: Construction and commissioning status 2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1246 - 1250
- [38] CONSTRUCTION AND COMMISSIONING EXPERIENCE WITH KNK ATOMWIRTSCHAFT-ATOMTECHNIK, 1973, 18 (02): : 88 - 93
- [39] The CMS Preshower construction and commissioning NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 103 - 104
- [40] Construction and commissioning of the SuperORRUBA detector NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2013, 711 : 160 - 165