Construction and commissioning of the first wiggler at BEPC

被引:0
|
作者
Jiyang, Zeng
Caitu, Shi
Jian, Sun
Renhuai, Chen
Maosan, Liu
Shaoxing, Chen
机构
关键词
D O I
10.1016/0168-9002(91)90075-2
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Construction and performance of a superconducting multipole Wiggler
    Hwang, CS
    Wang, B
    Chen, JY
    Chang, CH
    Chen, HH
    Fan, TC
    Lin, FY
    Huang, MH
    Chang, CC
    Hsu, SN
    Hsiung, GY
    Hsu, KT
    Chen, J
    Chien, YC
    Chen, JR
    Chen, CT
    SYNCHROTRON RADIATION INSTRUMENTATION, 2004, 705 : 199 - 202
  • [32] Design, construction, and first commissioning results of superconducting source for ions at NSCL/MSU
    Zavodszky, P. A.
    Arend, B.
    Cole, D.
    DeKamp, J.
    Doleans, M.
    Machicoane, G.
    Marti, F.
    Miller, P.
    Moskalik, J.
    Nurnberger, W.
    Ottarson, J.
    Vincent, J.
    Wu, X.
    Zeller, A.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2008, 79 (02):
  • [33] Construction, commissioning, and cryogenic performances of the first TESLA test facility (TTF) cryomodule
    Pagani, C
    Weisend, JG
    Bandelmann, R
    Barni, D
    Bosotti, A
    Grygiel, G
    Kaiser, H
    Knopf, U
    Lange, R
    Loeffler, F
    Pierini, P
    Peters, O
    Petersen, B
    Sellmann, D
    Wolff, S
    ADVANCES IN CRYOGENIC ENGINEERING, VOL 43 PTS A AND B, 1998, 43 : 87 - 96
  • [34] PLANNING, CONSTRUCTION AND COMMISSIONING OF KWW
    KOCH, M
    VENNEMANN, J
    ATOMWIRTSCHAFT, 1972, 17 (02): : 98 - +
  • [35] Detector construction, QC and commissioning
    Ball, A
    INNOVATIVE DETECTORS FOR SUPERCOLLIDERS, 2004, 25 : 15 - 30
  • [36] Construction and commissioning for membrane desalting
    Harris, C
    DESALINATION, 1999, 126 (1-3) : 127 - 127
  • [37] LHC: Construction and commissioning status
    Evans, L.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 1246 - 1250
  • [38] CONSTRUCTION AND COMMISSIONING EXPERIENCE WITH KNK
    GILLES, J
    HENDL, G
    HERBERG, G
    MAUSBECK, H
    BRUDERMULLER, G
    FINKE, G
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1973, 18 (02): : 88 - 93
  • [39] The CMS Preshower construction and commissioning
    Lu, Rong-Shyang
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 103 - 104
  • [40] Construction and commissioning of the SuperORRUBA detector
    Bardayan, D. W.
    Ahn, S.
    Blackmon, J. C.
    Burkhart, A. J.
    Chae, K. Y.
    Cizewski, J. A.
    Elson, J.
    Hardy, S.
    Kozub, R. L.
    Linhardt, L.
    Manning, B.
    Matos, M.
    Pain, S. D.
    Sobotka, L. G.
    Smith, M. S.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2013, 711 : 160 - 165