HHV FACILITY - EXPERIENCE IN CONSTRUCTION AND COMMISSIONING

被引:0
|
作者
HEBEL, G [1 ]
WEISKOPF, H [1 ]
TERKESSIDIS, J [1 ]
HOFMANN, W [1 ]
机构
[1] HOCHTEMP HELIUM VERSUCHSANLAGE BETRIEBSGESELL MBH JULICH,D-5170 JULICH,FED REP GER
来源
ATOMWIRTSCHAFT-ATOMTECHNIK | 1982年 / 27卷 / 05期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:258 / 262
页数:5
相关论文
共 50 条
  • [1] Design and commissioning experience of salt facility
    de Kock, M
    Venter, S
    ASTRONOMICAL STRUCTURES AND MECHANISMS TECHNOLOGY, 2004, 5495 : 247 - 257
  • [2] CONSTRUCTION AND COMMISSIONING EXPERIENCE WITH KNK
    GILLES, J
    HENDL, G
    HERBERG, G
    MAUSBECK, H
    BRUDERMULLER, G
    FINKE, G
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1973, 18 (02): : 88 - 93
  • [3] Construction and Commissioning of PAL-XFEL Facility
    Ko, In Soo
    Kang, Heung-Sik
    Heo, Hoon
    Kim, Changbum
    Kim, Gyujin
    Min, Chang-Ki
    Yang, Haeryong
    Baek, Soung Youl
    Choi, Hyo-Jin
    Mun, Geonyeong
    Park, Byoung Ryul
    Suh, Young Jin
    Shin, Dong Cheol
    Hu, Jinyul
    Hong, Juho
    Jung, Seonghoon
    Kim, Sang-Hee
    Kim, KwangHoon
    Na, Donghyun
    Park, Soung Soo
    Park, Yong Jung
    Jung, Young Gyu
    Jeong, Seong Hun
    Lee, Hong Gi
    Lee, Sangbong
    Lee, Sojeong
    Oh, Bonggi
    Suh, Hyung Suck
    Han, Jang-Hui
    Kim, Min Ho
    Jung, Nam-Suk
    Kim, Young-Chan
    Lee, Mong-Soo
    Lee, Bong-Ho
    Sung, Chi-Won
    Mok, Ik-Su
    Yang, Jung-Moo
    Parc, Yong Woon
    Lee, Woul-Woo
    Lee, Chae-Soon
    Shin, Hocheol
    Kim, Ji Hwa
    Kim, Yongsam
    Lee, Jae Hyuk
    Park, Sang-Youn
    Kim, Jangwoo
    Park, Jaeku
    Eom, Intae
    Rah, Seungyu
    Kim, Sunam
    APPLIED SCIENCES-BASEL, 2017, 7 (05):
  • [4] OPERATING AND COMMISSIONING EXPERIENCE WITH THE DARLINGTON TRITIUM REMOVAL FACILITY
    DAVIDSON, RB
    QUELCH, J
    GUGLIELMI, F
    10TH ANNUAL CONFERENCE 1989 - CANADIAN NUCLEAR SOCIETY, PROCEEDINGS VOL 3, 1989, : G20 - G25
  • [5] Investigations of Near Miss Incidents - New Facility Construction and Commissioning Activities
    Popp, Josh D.
    Scarborough, Mark S.
    2016 IEEE IAS ELECTRICAL SAFETY WORKSHOP (ESW), 2016, : 53 - 59
  • [6] Construction and Beam Commissioning of J-PARC Hadron Experimental Facility
    Sato, Yoshinori
    Agari, Keizo
    Hirose, Erina
    Ieiri, Masaharu
    Katoh, Yohji
    Kiyomichi, Akio
    Minakawa, Michifumi
    Muto, Ryotaro
    Naruki, Megumi
    Noumi, Hiroyuki
    Sawada, Shin'ya
    Shirakabe, Yoshihisa
    Suzuki, Yoshihiro
    Takahashi, Hitoshi
    Takasaki, Minoru
    Tanaka, Kazuhiro
    Toyoda, Akihisa
    Yamanoi, Yutaka
    Watanabe, Hiroaki
    NUCLEAR PHYSICS TRENDS, 2010, 1235 : 301 - +
  • [7] Commissioning experience and beam physics measurements at the SwissFEL Injector Test Facility
    Schietinger, T.
    Pedrozzi, M.
    Aiba, M.
    Arsov, V.
    Bettoni, S.
    Beutner, B.
    Calvi, M.
    Craievich, P.
    Dehler, M.
    Frei, F.
    Ganter, R.
    Hauri, C. P.
    Ischebeck, R.
    Ivanisenko, Y.
    Janousch, M.
    Kaiser, M.
    Keil, B.
    Lohl, F.
    Orlandi, G. L.
    Loch, C. Ozkan
    Peier, P.
    Prat, E.
    Raguin, J. -Y.
    Reiche, S.
    Schilcher, T.
    Wiegand, P.
    Zimoch, E.
    Anicic, D.
    Armstrong, D.
    Baldinger, M.
    Baldinger, R.
    Bertrand, A.
    Bitterli, K.
    Bopp, M.
    Brands, H.
    Braun, H. H.
    Bronnimann, M.
    Brunnenkant, I.
    Chevtsov, P.
    Chrin, J.
    Citterio, A.
    Divall, M. Csatari
    Dach, M.
    Dax, A.
    Ditter, R.
    Divall, E.
    Falone, A.
    Fitze, H.
    Geiselhart, C.
    Guetg, M. W.
    PHYSICAL REVIEW ACCELERATORS AND BEAMS, 2016, 19 (10):
  • [8] The commissioning of the BRISOL facility
    Tang, B.
    Cui, B.
    Chen, L.
    Huang, Q.
    Ma, R.
    Ma, Y.
    Ma, X.
    Zhang, T.
    Jiang, W.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2016, 376 : 429 - 433
  • [9] Construction and commissioning test results of the test facility for the ITER CS Model Coil
    Nakajima, H
    Hiyama, T
    Kato, T
    Kawano, K
    Isono, T
    Sugimoto, M
    Koizumi, N
    Hamada, K
    Nunoya, Y
    Matsui, H
    Oshikiri, M
    Hanawa, H
    Seki, S
    Wakabayashi, H
    Takano, K
    Uno, Y
    Honda, T
    Nishida, K
    Ito, T
    Sekiguchi, S
    Ohuchi, T
    Tajiri, F
    Okayama, J
    Takaya, Y
    Kawasaki, T
    Imahashi, K
    Ohotsu, K
    Ando, T
    Takahashi, Y
    Nishi, M
    Tsuji, H
    Shimamoto, S
    FUSION TECHNOLOGY, 1996, 30 (03): : 1248 - 1252
  • [10] DESIGN, CONSTRUCTION, AND COMMISSIONING OF EBR-II REACTOR HYDRAULIC TEST FACILITY
    CERCHIONE, JD
    MCGINNIS, FD
    LONG, PM
    RICE, RE
    GOPALAKRISHNAN, A
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1972, 15 (02): : 862 - +