HHV FACILITY - EXPERIENCE IN CONSTRUCTION AND COMMISSIONING

被引:0
|
作者
HEBEL, G [1 ]
WEISKOPF, H [1 ]
TERKESSIDIS, J [1 ]
HOFMANN, W [1 ]
机构
[1] HOCHTEMP HELIUM VERSUCHSANLAGE BETRIEBSGESELL MBH JULICH,D-5170 JULICH,FED REP GER
来源
ATOMWIRTSCHAFT-ATOMTECHNIK | 1982年 / 27卷 / 05期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:258 / 262
页数:5
相关论文
共 50 条
  • [11] Construction, commissioning, and cryogenic performances of the first TESLA test facility (TTF) cryomodule
    Pagani, C
    Weisend, JG
    Bandelmann, R
    Barni, D
    Bosotti, A
    Grygiel, G
    Kaiser, H
    Knopf, U
    Lange, R
    Loeffler, F
    Pierini, P
    Peters, O
    Petersen, B
    Sellmann, D
    Wolff, S
    ADVANCES IN CRYOGENIC ENGINEERING, VOL 43 PTS A AND B, 1998, 43 : 87 - 96
  • [12] Investigations of Near Miss Incidents-New Facility Construction and Commissioning Activities
    Popp, Josh D.
    Scarborough, Mark S.
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2017, 53 (01) : 615 - 621
  • [13] RECENT DESIGN, CONSTRUCTION AND COMMISSIONING EXPERIENCE OF THE STANDARDIZED GERMAN PWR
    SCHOLTEN, VW
    PUTSCHOGL, GW
    GOOD PERFORMANCE IN NUCLEAR PROJECTS, 1989, : 173 - 193
  • [14] COMMISSIONING AND 1ST OPERATING EXPERIENCE AT DARLINGTON TRITIUM REMOVAL FACILITY
    DAVIDSON, RB
    VONHATTEN, P
    SCHAUB, M
    ULRICH, D
    FUSION TECHNOLOGY, 1988, 14 (02): : 472 - 479
  • [15] The LIL facility quadruplet commissioning
    Di-Nicola, J. M.
    Fleurot, N.
    Lonjaret, T.
    Julien, X.
    Bordenavel, E.
    Le Garrec, B.
    Mangeant, M.
    Behar, G.
    Chies, T.
    Feral, C.
    Graillot, H.
    Luttmann, M.
    Jequier, F.
    Journot, E.
    Lutz, O.
    Thiell, G.
    JOURNAL DE PHYSIQUE IV, 2006, 133 : 595 - 600
  • [16] Commissioning the DRAGON facility at ISAC
    Engel, S
    Hutcheon, D
    Bishop, S
    Buchmann, L
    Caggiano, J
    Chatterjee, ML
    Chen, AA
    D'Auria, J
    Gigliotti, D
    Greife, U
    Hunter, D
    Hussein, A
    Jewett, CC
    Laird, AM
    Lamey, M
    Liu, W
    Olin, A
    Ottewell, D
    Pearson, J
    Ruiz, C
    Ruprecht, G
    Trinczek, M
    Vockenhuber, C
    Wrede, C
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2005, 553 (03): : 491 - 500
  • [17] Commissioning the Animal Facility for the Animals
    Watson, M.
    Wiler, R.
    Asghari, V.
    JOURNAL OF THE AMERICAN ASSOCIATION FOR LABORATORY ANIMAL SCIENCE, 2011, 50 (05): : 723 - 723
  • [18] Commissioning of the European XFEL Facility
    Noelle, D.
    ADVANCES IN X-RAY FREE-ELECTRON LASERS INSTRUMENTATION IV, 2017, 10237
  • [19] BEPCⅡ: construction and commissioning
    张闯
    中国物理C, 2009, (S2) : 60 - 64
  • [20] Ethics in commissioning in construction
    Lohne, Jardad
    Shirkavand, Iman
    Firing, Martine
    Schneider, Kim
    Laedre, Ola
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 256 - 263