共 50 条
- [41] Re-commissioning of the Ethanol facility in Babilafuente ZUCKERINDUSTRIE, 2008, 133 (10): : 666 - 666
- [42] DAφNE Beam Test Facility commissioning PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 1658 - 1660
- [43] High Voltage Test Facility commissioning and utilization EIC 2014 - Proceedings of the 32nd Electrical Insulation Conference, 2014, : 245 - 248
- [45] Commissioning of the cryogenic safety test facility PICARD ADVANCES IN CRYOGENIC ENGINEERING, 2015, 101
- [46] Commissioning of SPIRAL, the GANIL Radioactive Beam Facility CYCLOTRONS AND THEIR APPLICATIONS 2001, 2001, 600 : 59 - 63
- [47] Commissioning of the EXCYT facility at INFN-LNS The European Physical Journal Special Topics, 2007, 150 : 243 - 248
- [49] Dosimetry commissioning of the gamma irradiation facility "ROBO" RADIATION PHYSICS AND CHEMISTRY, 1998, 52 (1-6): : 585 - 589
- [50] The CMS Preshower construction and commissioning NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 103 - 104