HHV FACILITY - EXPERIENCE IN CONSTRUCTION AND COMMISSIONING

被引:0
|
作者
HEBEL, G [1 ]
WEISKOPF, H [1 ]
TERKESSIDIS, J [1 ]
HOFMANN, W [1 ]
机构
[1] HOCHTEMP HELIUM VERSUCHSANLAGE BETRIEBSGESELL MBH JULICH,D-5170 JULICH,FED REP GER
来源
ATOMWIRTSCHAFT-ATOMTECHNIK | 1982年 / 27卷 / 05期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:258 / 262
页数:5
相关论文
共 50 条
  • [41] Re-commissioning of the Ethanol facility in Babilafuente
    不详
    ZUCKERINDUSTRIE, 2008, 133 (10): : 666 - 666
  • [42] DAφNE Beam Test Facility commissioning
    Mazzitelli, G
    Ghigo, A
    Preger, MA
    Sannibale, F
    Valente, P
    Vignola, G
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 1658 - 1660
  • [43] High Voltage Test Facility commissioning and utilization
    McDermid, W.
    Lambert, J.
    Jacob, N.
    Polischuk, N.
    Manmohan, A.
    EIC 2014 - Proceedings of the 32nd Electrical Insulation Conference, 2014, : 245 - 248
  • [44] Practical Dosimetry and Commissioning of a Blood irradiation facility
    Rahim, H.
    Merz, F.
    STRAHLENTHERAPIE UND ONKOLOGIE, 2012, 188 : 190 - 190
  • [45] Commissioning of the cryogenic safety test facility PICARD
    Heidt, C.
    Schoen, H.
    Stamm, M.
    Grohmann, S.
    ADVANCES IN CRYOGENIC ENGINEERING, 2015, 101
  • [46] Commissioning of SPIRAL, the GANIL Radioactive Beam Facility
    Lieuvin, M
    Bertrand, P
    Bibet, D
    Bru, B
    Chautard, F
    Duval, M
    Richaud, C
    Varenne, F
    CYCLOTRONS AND THEIR APPLICATIONS 2001, 2001, 600 : 59 - 63
  • [47] Commissioning of the EXCYT facility at INFN-LNS
    D. Rifuggiato
    G. Cuttone
    L. Celona
    F. Chines
    L. Cosentino
    E. Messina
    M. Re
    D. Rizzo
    V. Scuderi
    F. Tudisco
    A. Amato
    L. Calabretta
    G. De Luca
    S. Marletta
    A. Pappalardo
    S. Passarello
    A. Rovelli
    The European Physical Journal Special Topics, 2007, 150 : 243 - 248
  • [48] Commissioning of the Main Coil of the EDIPO Test Facility
    Bruzzone, P.
    March, S.
    Croari, G.
    Jenni, M.
    Uglietti, D.
    Stepanov, B.
    Wesche, R.
    Vogel, M.
    Portone, A.
    Cau, F.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2014, 24 (03)
  • [49] Dosimetry commissioning of the gamma irradiation facility "ROBO"
    Kovacs, A
    Moussa, A
    Othman, I
    Alnaal, K
    RADIATION PHYSICS AND CHEMISTRY, 1998, 52 (1-6): : 585 - 589
  • [50] The CMS Preshower construction and commissioning
    Lu, Rong-Shyang
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 103 - 104